Planning Applications in Compton (Winchester)

Planning authority: Winchester

6 last 90 days
|
1 last 30 days
|
0 last 14 days

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Application type
Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 6 of 6 applications
26/01198/TPO 9 Jun 2026 Current

Beech House Clease Way Compton Down Winchester Hampshire SO21 2AL

T1- Copper beech, Crown lift to 4m due to canopy being near head height. Reduce previously cable braced branch on southern aspect by 1.5-2m to maintai...

Tree Preservation Order Winchester 9 Jun 2026
26/01162/DIC 3 Jun 2026 Decided

Erdely Clease Way Compton Down Winchester Hampshire SO21 2AL

This application looks to discharge condition 4 with the submittal of drawing W1797D TPP01, which indicates the proposed tree protection fencing in re...

Details in Compliance Winchester 3 Jun 2026
26/01119/TPO 28 May 2026 Current

St Michaels Copse Shepherds Lane Compton Winchester Hampshire SO21 2AD

Ash trees, part of G1 group in the TPO. Fell one, ash dieback. Reduce/Fell 2 also impacted by ash dieback and may cause damage if they fall. I have a ...

Tree Preservation Order Winchester 28 May 2026
26/00961/TPO 8 May 2026 Decided

Shawford Springs Care Home Otterbourne Road Compton Winchester Hampshire SO21 2RT

T1 Oak, crown lift to 5.2m and remove deadwood. The trees branches are growing too low over the car park. (Amended) T2 Oak, crown lift to 5.2m and rem...

Tree Preservation Order Winchester 8 May 2026
26/00967/DIC 8 May 2026 Decided

Oakland House Field Way Compton Winchester Hampshire SO21 2AF

Discharge of condition 5 (construction management plan) of application 26/00169/VAR

Details in Compliance Winchester 8 May 2026
26/00858/DIC 23 Apr 2026 Current

Southdown Grange Southdown Road Shawford Winchester Hampshire SO21 2BY

Discharge of condition 3 (external material schedule) and 4 (foul and surface water details) of application 25/01832/FUL

Details in Compliance Winchester 23 Apr 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new planning applications in Compton (Winchester)

Data updated daily. Source: Winchester planning portal.