Planned new homes in Chesterfield

53 applications for new homes were submitted in Chesterfield in the last 12 months, proposing 827 dwellings between them. The largest single scheme proposes 350 homes in Staveley South. Of the 19 decided so far, 16 were approved. New applications appear here within a day of the council publishing them.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 12 of 12 applications
4 Nov 2026 Awaiting decision CHE/26/00926/FUL

The Saltergate 107 Saltergate Chesterfield Derbyshire S40 1LD

Creation of 4 flats and erection of a rear extension for 6 flats, external alterations and new boundary wall and ramp

Full Application Chesterfield
26 Oct 2026 Awaiting decision CHE/26/00979/FUL

17 Stephenson Place Chesterfield Derbyshire S40 1XL

Conversion to form first floor flat and commercial unit

Full Application Chesterfield
7 Oct 2026 Awaiting decision CHE/26/00889/FUL

Sunrisers Lodge Ralph Road Staveley Chesterfield Derbyshire S43 3PY

A retrospective planning application for a single park home, stoned yard and boundary walls/fences

Full Application Chesterfield
7 Oct 2026 Awaiting decision CHE/26/00848/FUL

59-65 Chatsworth Road Chesterfield Derbyshire S40 2AL

Conversion and Extension of Existing Mixed-Use Premises to Provide Four Commercial Units (Use Class E) at Ground Floor and Two Seven-Bedroom Houses in...

Full Application Chesterfield
30 Sept 2026 Awaiting decision CHE/26/00840/FUL

2-4 Robin Croft Grangewood Chesterfield Derbyshire S40 2JB

2No. 2 Bedroomed Replacement Dwellings

Full Application Chesterfield
24 Sept 2026 Awaiting decision CHE/26/00783/FUL

15 Storrs Road Chesterfield Derbyshire S40 3QA

Pair of 1-bedroom built-to-rent bungalows for tenants over 55 years

Full Application Chesterfield
22 Sept 2026 Awaiting decision CHE/26/00676/LBC

Former Walton Works and Boythorpe Works Factory Street Chesterfield Derbyshire

Conversion of Walton Works mill to form 3 commercial units and 37 apartments and conversion of Walton Mill Terrace to provide 11 townhouses with assoc...

Listed Building Consent Chesterfield
22 Sept 2026 Awaiting decision CHE/26/00675/FUL

Former Walton Works and Boythorpe Works Factory Street Chesterfield Derbyshire

Conversion of Walton Works mill to form 3 commercial units and 37 apartments, conversion of Walton Mill Terrace to provide 11 townhouses and construct...

Full Application Chesterfield
22 Sept 2026 Awaiting decision CHE/26/00705/FUL

Site Of Former 48 Newbold Back Lane Chesterfield Derbyshire

Proposed new bungalow to be used as children's home for up to two young people

Full Application Chesterfield
22 Sept 2026 Awaiting decision CHE/26/00851/FUL

20 Hazel Drive Walton Chesterfield Derbyshire S40 3EN

Demolition of existing outbuildings and erection of a single storey building to provide living accommodation for dependent relatives

Full Application Chesterfield
3 Sept 2026 Awaiting decision CHE/26/00712/OUT

Land Adjacent To 21 Southfield Avenue Hasland Chesterfield Derbyshire

Outline planning consent for two dwellings

Outline Application Chesterfield
20 Aug 2026 Awaiting decision CHE/26/00715/FUL

109 Chesterfield Road Staveley Chesterfield Derbyshire S43 3QJ

Erection of a two-storey extension to the side of the existing dwelling to create a new self-contained dwellinghouse

Full Application Chesterfield
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new homes applications in Chesterfield

Set up alerts

Frequently asked questions

What's the difference between outline and full planning permission?
Outline planning permission establishes the principle of development (is housing acceptable here?) while leaving specifics like layout and appearance to later applications. Full planning permission includes all details upfront. Outline is typically followed by 'reserved matters' applications that fill in the specifics.
What are 'reserved matters' in a planning application?
Details that an outline permission left to be approved later. There are five reserved matters: access, appearance, landscaping, layout and scale. They must usually be submitted within 3 years of the outline permission being granted.
How long does a planning decision for a new home take?
Statutory targets are 8 weeks for minor applications (1-9 dwellings) and 13 weeks for major applications (10+ dwellings), measured from the date the application is validated. Complex cases or appeals can take much longer.
Can I get email alerts for new homes applications in Chesterfield?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new homes application published by Chesterfield. You can also narrow the alert to a postcode, street, or drawn area.

We check Chesterfield's planning portal daily. New homes applications appear here within a day of being published.