Land with live planning permission
Plots of 250 m² or more approved for development and still inside the time limit. Builders' and developers' own land ranks below the rest.
32,611 sites fit this search today
Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.
A land search, from the first words to a shortlist
38 seconds. Type what you are looking for, see the sites that fit, open one and save it to a shortlist.
What the search looks for
Each line is a filter on the map, so you can widen or tighten any of them.
Open the search- Approved for development and still inside its time limit
- A plot of 250 m² or more
On every site
- The decision
- What was approved or refused, when, for how many homes, and the date a permission runs out.
- The council's record
- Each application links to its page on Plota and from there to the council's own record.
- The land itself
- Size, constraints, the kind of owner and the last sale on record.
Why these rules
Council planning registers. The 250 m² floor is Plota's: in a sample, nine in ten permissions on smaller parcels were a flat, a house in multiple occupation or a shop changing use inside an existing building.
Sites from the search
Six of the sites the search returned on 10 November 2026. Each opens on the map with its record.
-
Beckley and Stowood12.2 ha
South Oxfordshire
Permission time limit 18 Nov 2028Homes in the permission 1,450
-
Cranbrook30.5 ha
East Devon
Permission time limit 24 Apr 2027Homes in the permission 1,435
-
Fen Ditton11.7 ha
South Cambridgeshire
Permission time limit 23 Jul 2028Homes in the permission 1,391
-
Stamford37.0 ha
South Kesteven
Permission time limit 29 Oct 2028Homes in the permission 1,350
-
Tangmere25.8 ha
Chichester
Permission time limit 28 May 2028Homes in the permission 1,300
-
Tonge25.9 ha
Swale
Permission time limit 7 Nov 2027Homes in the permission 1,250
Imagery: Mapbox and Maxar. Boundaries: HM Land Registry INSPIRE, Crown copyright.
Related searches
- Land with planning permission about to expireApproved; its time limit to start, or for an outline to apply for the details, falls in the next 12 months; a plot of 250 m² or more
- Land approved for 10 or more homesApproved at any time on record, on a parcel large enough to hold the homes
- Land with lapsed planning permissionTime limit passed, with no start or later approval on record
- Land awaiting a planning decisionAn application on the site awaiting a decision
