Land South West of Mile Lane Penrith CA11 0DT Data via plota.co.uk

2026/2111/RMA - Reserved Matters Consultation Started

Proposal

Reserved Matters for appearance, landscaping, layout and scale attached to Outline planning permission (Outline planning permission for use classes B1 (business), B2 (general industrial) and B8 (storage and distribution) with approval for access). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
Decision
Expected by 28 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Jan 2027 and 22 Jan 2027, from Westmorland and Furness's recent commercial and major works.

Comments are open until 12 Dec 2026

Comment on this application ↗

Documents 37

Plans & drawings 33

PDF Existing and Proposed Floor Plan Unit B1 Floor plan · 2 Nov 2026 View ↗ PDF Existing and Proposed Floor Plan Unit B2 Floor plan · 2 Nov 2026 View ↗ PDF Existing and Proposed Floor Plan Unit C1 Floor plan · 2 Nov 2026 View ↗ PDF Existing and Proposed Floor Plan Unit C2 Floor plan · 2 Nov 2026 View ↗ PDF Existing and Proposed Floor Plan Unit D1 Floor plan · 2 Nov 2026 View ↗ PDF Existing and Proposed Floor Plan Unit D2 Floor plan · 2 Nov 2026 View ↗ PDF Existing and Proposed Floor Plan Unit E1 Floor plan · 2 Nov 2026 View ↗ PDF Management Suite Plan and front elevation Mixed/Combined Plan · 2 Nov 2026 View ↗ PDF Landscape Proposals Boulevard Elevations Mixed/Combined Plan · 2 Nov 2026 View ↗ PDF Proposed Block/Site Plan Block plan of the site · 2 Nov 2026 View ↗ PDF Proposed Master Site Plan Proposed Block/Site Plan · 2 Nov 2026 View ↗ PDF Proposed Site Plan Phase 1 Proposed Block/Site Plan · 2 Nov 2026 View ↗ PDF Proposed Site Plan Phase 2 Proposed Block/Site Plan · 2 Nov 2026 View ↗ PDF Management Suite elevations Proposed Elevations Plan · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit B1 elevations · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit B2 elevations · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit C1 elevations · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit C2 elevations · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit D1 elevations · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit D2 elevations · 2 Nov 2026 View ↗ PDF Proposed Elevations Plan Unit E1 elevations · 2 Nov 2026 View ↗ PDF Landscape Layout Masterplan Proposed Layout Plan · 2 Nov 2026 View ↗ PDF Landscape Proposals Main Entrance Proposed Plan · 2 Nov 2026 View ↗ PDF Landscape Proposals Tree Palette Proposed Plan · 2 Nov 2026 View ↗ PDF Landscape Layout Main Entrance and Boulevard Proposed Plan · 2 Nov 2026 View ↗ PDF Unit B1 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Unit B2 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Unit C1 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Unict C2 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Unit D1 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Unit D2 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Unit E1 Roof Plan - Proposed Proposed Roof Plan · 2 Nov 2026 View ↗ PDF Site Location Plan The location plan · 2 Nov 2026 View ↗

All documents on the council site ↗

Associated applications 2

  • Part of

    Outlinecouncil archive
    • Reserved mattersReserved Matters for appearance, landscaping, layout and scaleThis application2026/2111/RMA

Site constraints 5

Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 119 m away: A66 Northern Trans-Pennine Project
The site is 119 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Reserved Matters
Postcode
CA11 0DT
Received
2 Nov 2026
Validated
2 Nov 2026
Ward
Greystoke and Ullswater
Parish
Dacre
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Alpha Design

Decision outlook

Day 22 of the 56-day target. Westmorland and Furness usually decides commercial and major works by day 72.

Day 2250 days to the predicted decision (day 72)
39%decided within 8 weeks
95%approved
64decided in the last year

Plota live figures for commercial and major works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
17 Nov 2026
Comments by
12 Dec 2026
Site or press notice
17 Nov 2026
Statutory expiry
1 Feb 2027
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Major dwellings

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026