Land East Of 104 - 112 London Road Chatteris Cambridgeshire Data via plota.co.uk

F/YR26/0720/F - Full Planning Permission Pending decision

Proposal

Formation of a temporary access (in association with S278 highway works relating to ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Sept 2026
✓
Validated
29 Sept 2026
✓
Consultation
20 Oct 2026
Decision
Target date was 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Fenland's recent utility and infrastructure works.

The consultation period closed on 10 Nov 2026.

Associated applications 14

Site constraints 2

Also on the record
National infrastructure project about 651 m away: Fens Reservoir, at pre-application; Inside the Chatteris built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fenland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fenland
Application type
Full Planning Permission
Received
18 Sept 2026
Validated
29 Sept 2026
Ward
Chatteris South
Parish
Chatteris Town Council
Case officer
Show
Target decision
6 Nov 2026
Applicant
Show

Decision outlook

Day 55, past Fenland's usual 54 days for utility and infrastructure works. 98% are decided within thirteen weeks, so most likely by 29 Dec 2026.

Day 551 days to the 56-day target
76%decided within 8 weeks
98%approved
47decided in the last year

Plota live figures for utility and infrastructure works decided by Fenland in the last twelve months, from validation. Fenland decision record →

Public comments

1comment received
1 neutral

6 neighbours consulted · Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15212442
Planning Portal ref
PP-15212442
Neighbours
1 Oct 2026
Consultation
20 Oct 2026
Comments by
10 Nov 2026
Site or press notice
9 Oct 2026
Statutory expiry
24 Nov 2026
Env. assessment
No
Fenland
Planning Authority Score
6.1/10
Average
#98 of 296 overall
Relevant to this application:
Householder decisions

Fenland is faster than most councils at deciding householder applications: #58 of 296 on speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Fenland decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #170 of 296
93%
Householder approved
Above avg (90%) #128 of 296
77%
Decided in 8 weeks
Above avg (63%) #58 of 296
42%
Extended time limit
Above avg (41%) #163 of 296
78%
Minor dwellings approved
194 decided (1-9 homes)
77%
Major dwellings approved
26 decided (10+ homes)
90%
Change of use approved
29 decided
604
Total decisions
79 refused in the year to March 2026