1 - 2 Admiral Park Airport Service Road Portsmouth PO3 5RQ Data via plota.co.uk

26/00936/FUL - Full Application Awaiting decision

Proposal

Construction of 3no. freestanding outdoor padel courts to existing car park Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Aug 2026
✓
Validated
8 Sept 2026
✓
Consultation
11 Sept 2026
Decision
Target date was 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 6 Dec 2026, from Portsmouth's recent commercial and major works.

The consultation period closed on 9 Oct 2026.

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 940 m away: AQUIND Interconnector
The site is 940 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 1.1 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 3; Inside the Portsmouth built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area760 m² (8,181 sq ft)
Energy ratingB (asset rating 46)
UseGeneral Industrial and Special Industrial Groups
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in April 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO3 5RQ
Received
13 Aug 2026
Validated
8 Sept 2026
Ward
Copnor
Case officer
Show
Target decision
3 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Knight Consulting

Decision outlook

Day 76, past the statutory target. 64% of commercial and major works in Portsmouth are decided within thirteen weeks, which runs to 8 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 7620 days past the 56-day target
36%decided within 8 weeks
80%approved
12%go to committee

Plota live figures for commercial and major works decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

2comments received
1 neutral1 supporting

8 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15155335
Planning Portal ref
PP-15155335
Neighbours
11 Sept 2026
Consultation
11 Sept 2026
Comments by
9 Oct 2026
Statutory expiry
3 Nov 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 overall
Relevant to this application:
Householder decisions

Portsmouth is #188 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.