Longstone Hall,Main Street,Great Longstone, Data via plota.co.uk
Proposal
Listed Building consent - Removal and re-laying of existing tiles to western and northern pitched roofs. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision around 30 Oct 2026, from Peak District's recent listed building works.
Documents 13
Statements & assessments 3
Plans & drawings 5
Application forms 1
Consultation & comments 2
Site constraints 8
Show all 18 with distances
- 12 mCrispin InnGrade II
- 23 mVillage CrossGrade II
- 28 mGate Piers, Attached Boundary Walls, Pump and Trough at the HallGrade II
- 32 mGates and Gate Piers to the Manor HouseGrade II
- 34 mChurchlady House and Attached Garden Wall and Gate PiersGrade II
- 39 mK6 Telephone KioskGrade II
- 51 mWar MemorialGrade II
- 55 mShakerleyGrade II
- 59 mThe Manor HouseGrade II
- 71 mThe Hollies and Attached Gate Piers and Garden WallGrade II
- 98 mAsh HouseGrade II
- 107 mStone Croft, Cuckoo Cottage and the Little HouseGrade II
- 115 mLower Stables at the HallGrade II
- 118 mWhite LionGrade II
- 129 mLaburnum HouseGrade II
- 130 mThe FarmGrade II
- 131 mThe HallGrade II*
- 133 mUpper Stables at the HallGrade II
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in October 2022, the latest held for this property. The building may have changed since. View the certificate
Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Tithe Barn,Main Street,Great Longstone,DE45 1TZ
T1 - Removal of 2 x lower branches from Ash tree overhanging the road T2 - Remo...
Shakerley, Main Street, Great Longstone, Bakewell, DE45 1TZ
due to lack of access for a cherry picker and the inability to remove the tree f...
The Stable House,Main Street,Great Longstone,DE45 1TZ
Following the recent Deadwood and tree inspection we came across 2 defective lim...
Beech House,Main Street,Great Longstone,Bakewell,DE45 1TF
Reduce a hedge to make it a manageable maintainable liner shape
Nearby new applications
Tithe Barn,Main Street,Great Longstone,DE45 1TZ
T1 - Removal of 2 x lower branches from Ash tree overhanging the road T2 - Remo...
Beech House,Main Street,Great Longstone,Bakewell,DE45 1TF
Reduce a hedge to make it a manageable maintainable liner shape
Shakerley, Main Street, Great Longstone, Bakewell, DE45 1TZ
due to lack of access for a cherry picker and the inability to remove the tree f...
Home Farm,Main Street,Great Longstone,
Conversion of an existing stone barn into domestic living accommodation, togeth...
The Stable House,Main Street,Great Longstone,DE45 1TZ
Following the recent Deadwood and tree inspection we came across 2 defective lim...
Longstone Hall,Main Street,Great Longstone,
Internal alteration to replace Kitchen, Utility, boot room and cloakroom cupboar...
Important details
- Council
- Peak District
- Application type
- Listed Building Consent (alter or extend)
- Postcode
- DE45 1TZ
- Received
- 1 Sept 2026
- Validated
- 1 Sept 2026
- Parish
- Great Longstone
- Case officer
- Show
- Applicant
- Show
- Agent
- Show
Decision outlook
Day 59, past the statutory target. 82% of listed building works in Peak District are decided within thirteen weeks, which runs to 1 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.
Plota live figures for listed building works decided by Peak District in the last twelve months, from validation. Peak District decision record →
Consultation & key dates
- Consultation
- 2 Sept 2026
- Comments by
- 2 Oct 2026
- Statutory expiry
- 23 Oct 2026
Historical activity at this location
19 nearby applications on record - archival context, not part of the live application.
Nearby activity
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Longstone Hall, Main Street, Great Longstone
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
The consultation period closed on 2 Oct 2026.