Hemel North Primary Substation Redbourn Road Cupid Green Hemel Hempstead Grovehill HP2 5PN Data via plota.co.uk

26/01367/LDP - Lawful Development Certificate Proposed Approved

Proposal

Installation of a switch house building to accommodate additional electrical equipment and other development necessary for the supply of electricity on EPN's operational land. The ancillary development includes but is not limited to the extension of the access track and erection of firewalls. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2026
✓
Approved
30 Jul 2026

Approved on 30 Jul 2026 · Last checked 30 Sept 2026

Site constraints 5

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; 1 listed building within 150 m; Inside the Hemel Hempstead built-up area; Open access land 42 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dacorum - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dacorum
Application type
Lawful Development Certificate Proposed
Postcode
HP2 5PN
Received
17 Jun 2026
Validated
17 Jun 2026
Ward
Adeyfield East
Parish
Hemel Hempstead (No Parish)
Case officer
Show
Decision
Grant Permission/Consent
Decision date
30 Jul 2026
Applicant
Show
Agent
Dalcour Maclaren

How this decision compares

Decided in 43 days from validation, 5 days faster than Dacorum's median of 48 for utility and infrastructure works. Approved, as 93% of utility and infrastructure works here are.

79%decided within 8 weeks
93%approved
32decided in the last year

Plota live figures for utility and infrastructure works decided by Dacorum in the last twelve months, from validation. Dacorum decision record →

Public comments

No public comments yet.

Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15004597
Planning Portal ref
PP-15004597
Env. assessment
No
Dacorum
Planning Authority Score
7.3/10
Good
#51 of 296 overall
Relevant to this application:
Householder decisions

Dacorum is faster than most councils at deciding householder applications: #50 of 296 on speed. Only 22% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dacorum decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #150 of 296
91%
Householder approved
Above avg (90%) #171 of 296
78%
Decided in 8 weeks
Above avg (63%) #50 of 296
22%
Extended time limit
Below avg (41%) #22 of 296
76%
Minor dwellings approved
127 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
71%
Change of use approved
21 decided
1,130
Total decisions
132 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use