The Golden Dragon 1A The Beacon Exmouth EX8 2AG Data via plota.co.uk

25/2219/FUL - Full Application Approved

Proposal

Proposed change of use from commercial to residential, alterations to fenestration. New roofing to rear with installation of Solar panels Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 14 Nov 2025
✓
Approved
23 Mar 2026

Approved on 23 Mar 2026 · Delegated Decision · Last checked 9 Oct 2026

Associated applications 2

Site constraints 7

Grade II listed: 1 and 1a, the Beacon
List entry 1097901 · 1 m away · 29 more listed buildings within 150 m (1 Grade II*, 28 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 29 with distances
Historic England ↗
Exmouth conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 231 m away: Exe Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 231 m away: Exe Estuary SSSI; Inside the Exmouth built-up area; Priority habitat 27 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX8 2AG
Received
around 14 Nov 2025
Validated
14 Nov 2025
Ward
Exmouth Town
Parish
Exmouth
Target decision
27 Mar 2026
Decision
Approval with conditions
Decision date
23 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Paul Humphries Architects

How this decision compares

Decided in 129 days from validation, 79 days slower than East Devon's median of 50 for full applications. Approved, as 92% of full applications here are.

69%decided within 8 weeks
92%approved
5%go to committee

Plota live figures for full applications decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

5comments received
5 objecting

100% object · above the UK average of 74%

7 neighbours consulted · Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13832146
Planning Portal ref
PP-13832146
Site or press notice
26 Nov 2025
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 overall
Relevant to this application:
Change of use

East Devon is #103 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026