Solar PV farm at Lower House Farm, Lewth Lane, Preston

Summary of planning committee decision

Decided by Preston Planning Committee on 5 Jun 2025.

06/2025/0136Approved

The site and its setting

The site covered about 24 hectares of three agricultural fields in the open countryside, with brooks, flood defences and a public right of way.

“Location The application site relates to 3 existing agricultural fields, measuring approximately 24 hectares, belonging to Lower House Farm. The site forms a broadly triangular shape which comes to a point at the convergence of Woodplumpton Brook and New Mill Brook to north, which then run along the eastern and western boundaries of the site.”

“Access to the site is taken off Lewth Lane (B5269), a B-road with lanes running in both directions. The A6 lies approximately 3.35km to the east, and the M6 Motorway lies further east approximately 4.45km from the site. A public right of way (FP0610011) runs along the access track to the site from Lewth Lane and connects with Woods Lane to the north. The entire site is located within the Open Countryside as defined on the Preston Local Plan Policies Map.”

Officer report

Earlier planning history

No planning history was relevant to the application.

“Relevant planning history No history relevant to the current application.”

Officer report

What officers recommended

Officers recommended approval subject to conditions covering construction, biodiversity, drainage, access, landscaping, monitoring and removal of the equipment.

“Pre-commencement conditions 3. Construction Environmental Management Plan (Biodiversity) 4. Statutory Biodiversity Net Gain condition 5. Habitat Management and Monitoring Plan 6. Reasonable Avoidance Method Statement for protection of amphibians 7. PRoW Management Plan…”

“Pre-occupation and construction stage conditions 8. Development is in accordance with the submitted Flood Risk Assessment, Surface Water Sustainable Drainage Strategy and Sustainable Drainage Pro-forma 9. Lighting design strategy 10. Installation of bird and bat boxes…”

Officer report

The main planning balance

The proposal conflicted with countryside policies, but officers gave substantial weight to renewable-energy benefits and found other impacts acceptable with conditions.

“However, the principle of developing the application site for a solar farm to provide renewable energy complies with Core Strategy Policy 28. Furthermore, the provision of low carbon energy is central to the economic, social and environmental dimensions of sustainable development set out in the Framework and would help to support the governments net zero aspirations.”

“Statutory consultee comments have been received, and the comments have been carefully considered and taken into account. The adverse impacts of the application, which is the conflict with the development plan, should be given significant weight. Whilst the conflict with the development indicates the proposed development should be refused, it is important to note that the spatial strategy does not seek to protect the open countryside for its own sake.”

Officer report

Consultation and objection

Most consultees raised no objection subject to conditions, while one objection concerned increased traffic on narrow local roads.

“Consultation responses Greater Manchester Ecology Unit - No objection subject to conditions securing the submission of: A Construction Environmental Management Plan (Biodiversity); Lighting Design Strategy; Time limit on development before further ecology surveys are required; Reasonable Avoidance Method Statement for the protection of Amphibians…”

“Publicity – One objection was received following statutory consultation and the following concerns raised: • The proposed increase in traffic movements would put unacceptable pressure on local highway network which mainly comprises narrow country roads.”

Officer report

The committee vote

All seven members voted in favour of approving the application.

“Resolved – That the application be approved subject to conditions outlined in the report.”

“All Members (7) voted in favour of the resolution.”

Minutes

The final decision

The application was approved subject to the conditions outlined in the report.

“The Director of Development and Housing submitted a report on an application for one ground mounted Solar PV farm and associated infrastructure at Lower House Farm, Lewth Lane.”

Minutes

Councillors at the meeting

From a unanimous vote of the 7 members present for this item.

Apologies Lynne Brooks Labour, Peter Kelly Labour, Ben Ward Lib Dem

Also attending Pav Akhtar Labour

Source: Plota analysis of the council's minutes; parties from the council's list of councillors.

Sources

  • Preston Planning Committee minutes, 5 June 2025
  • Agenda and papers (council website)

Source: Plota analysis of Preston's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Preston
Date
Thursday 5 June 2025
Recommendation
Officers recommended approval
Committee decided
Approved
Councillors
7Labour 4Lib Dem 2Conservative 1Show votes
Minutes
The council's minutes
Meeting
Agenda and papers (council website)