Land Located To The South And East Of Wallyford And At Dolphingstone East Lothian Data via plota.co.uk

26/00696/AMM - Approval Matters Specified Condition Awaiting decision

Proposal

Approval of matters specified in conditions (1 a to i & k, 2(ii), 8, 24, 27 & 29) of planning permission in principle - Erection of 126 houses, 33 flats and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Validated
18 Aug 2026
✓
Consultation
20 Aug 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 52.

The consultation period closed on 20 Sept 2026.

Documents 143

Plans & drawings 121

PDF BOUNDARY TREATMENTS LAYOUT Drawing · 18 Aug 2026 View ↗ PDF ACOUSTIC TREATMENT LAYOUT Drawing · 18 Aug 2026 View ↗ PDF EXTERNAL MATERIALS LAYOUT Drawing · 18 Aug 2026 View ↗ PDF SITE LAYOUT Drawing · 18 Aug 2026 View ↗ PDF PARKING PROVISION AND ELECTRIC VEHICLE CHARGING LAYOUT Drawing · 18 Aug 2026 View ↗ PDF POST AND RAIL 900MM PLAN, ELEVATION AND SECTION Drawing · 10 Aug 2026 View ↗ PDF 1.8M FENCE, 1.8M TIMBER HIT AND MISS PLAN, SECTION AND GATE FIXING Drawing · 10 Aug 2026 View ↗ PDF DWARF WALL/FENCE 0.6M WALL/1.2M TIMBER HIT AND MISS PLAN AND SECTION Drawing · 10 Aug 2026 View ↗ PDF 1.8M FENCE TIMBER CLOSE BOARDED PLAN Drawing · 10 Aug 2026 View ↗ PDF 2.5M FENCE TIMBER CLOSE BOARDED PLAN Drawing · 10 Aug 2026 View ↗ PDF GROUND/FIRST/SECOND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST/SECOND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST/SECOND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST/SECOND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST/SECOND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST/SECOND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF GROUND/FIRST FLOOR PLAN AND ELEVATIONS Drawing · 7 Aug 2026 View ↗ PDF ACOUSTIC TREATMENT LAYOUT Drawing · 4 Aug 2026 View ↗ PDF CORNER FLATTED BLOCK PLANS/ELEVATIONS Drawing · 4 Aug 2026 View ↗ PDF LEVELS LAYOUT SHEET 1 OF 2 Drawing · 4 Aug 2026 View ↗ PDF PROPOSED SHALLOW MINING INVESTIGATION/TREATMENT LAYOUT Drawing · 4 Aug 2026 View ↗ PDF AREA 2 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 2 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 3 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 3 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 4 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 4 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 5 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 5 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 6 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 6 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 7 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 7 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 8 - COALS ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF AREA 8 - GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF AREA 9 - COAL ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF BOREHOLE LOCATION PLAN Drawing · 4 Aug 2026 View ↗ PDF CROSS SECTIONS 1 Drawing · 4 Aug 2026 View ↗ PDF CROSS SECTIONS 2 Drawing · 4 Aug 2026 View ↗ PDF OVERALL COAL ENCOUNTERED Drawing · 4 Aug 2026 View ↗ PDF OVERALL GROUT TAKES Drawing · 4 Aug 2026 View ↗ PDF SHAFT/FEATURE LOCATION PLAN Drawing · 4 Aug 2026 View ↗ PDF ELEVATIONS/FLOOR PLANS Drawing · 4 Aug 2026 View ↗ PDF ELEVATIONS/FLOOR PLANS Drawing · 4 Aug 2026 View ↗ PDF TREATMENT AREAS DEFINED BY M&J DRILLING SERVICES LTD Drawing · 4 Aug 2026 View ↗ PDF CORNER FLATTER BLOCK Drawing · 14 Jul 2026 View ↗ PDF REFUSE/CYCLE STORE DRAWING Drawing · 14 Jul 2026 View ↗ PDF PHASE 2B LEVELS LAYOUT SHEET 1 OF 2 Drawing · 14 Jul 2026 View ↗ PDF PHASE 2B LEVELS LAYOUT SHEET 2 OF 2 Drawing · 14 Jul 2026 View ↗ PDF PHASE 2B SPA REFUSE VEHICLE Drawing · 14 Jul 2026 View ↗ PDF LANDSCAPE LAYOUT Drawing · 14 Jul 2026 View ↗ PDF SALES OFFICE FLOOR PLAN AND ELEVATIONS Drawing · 14 Jul 2026 View ↗ PDF SALES OFFICE SECTION AND DETAILS Drawing · 14 Jul 2026 View ↗ PDF TIREE AIR M3 OPP Drawing · 14 Jul 2026 View ↗ PDF TIREE AIR Drawing · 14 Jul 2026 View ↗ PDF HOY Drawing · 14 Jul 2026 View ↗ PDF ORKNEY AIR Drawing · 14 Jul 2026 View ↗ PDF MULL AIR Drawing · 14 Jul 2026 View ↗ PDF SKYE OPP Drawing · 14 Jul 2026 View ↗ PDF SKYE Drawing · 14 Jul 2026 View ↗ PDF MULL AIR Drawing · 14 Jul 2026 View ↗ PDF MULL AIR Drawing · 14 Jul 2026 View ↗ PDF MULL AIR Drawing · 14 Jul 2026 View ↗ PDF WATERGROVE Drawing · 14 Jul 2026 View ↗ PDF WATERGROVE OPP Drawing · 14 Jul 2026 View ↗ PDF HARRIS AIR OPP Drawing · 14 Jul 2026 View ↗ PDF HARRIS AIR Drawing · 14 Jul 2026 View ↗ PDF LEWIS AIR Drawing · 14 Jul 2026 View ↗ PDF LEWIS AIR OPP Drawing · 14 Jul 2026 View ↗ PDF BARRA AIR Drawing · 14 Jul 2026 View ↗ PDF BARRA AIR OPP Drawing · 14 Jul 2026 View ↗ PDF KM END TERRACE OPP Drawing · 14 Jul 2026 View ↗ PDF KM-2B4P END TERRACE Drawing · 14 Jul 2026 View ↗ PDF KM-2B4P TERRACE Drawing · 14 Jul 2026 View ↗ PDF KM-2B4P TERRACE OPP Drawing · 14 Jul 2026 View ↗ PDF KILDA AIR OPP Drawing · 14 Jul 2026 View ↗ PDF KILDA AIR Drawing · 14 Jul 2026 View ↗ PDF KM 3B 5P ENDAFFORDABLE Drawing · 14 Jul 2026 View ↗ PDF KM 3B 5P OPPAFFORDABLE AIR Drawing · 14 Jul 2026 View ↗ PDF CUMBRAE AIR DETACH Drawing · 14 Jul 2026 View ↗ PDF CUMBRAE AIR OPP Drawing · 14 Jul 2026 View ↗ PDF CUMBRAE AIR Drawing · 14 Jul 2026 View ↗ PDF FLAT 1B OPP AFFORDABLE Drawing · 14 Jul 2026 View ↗ PDF FLAT 1B AFFORDABLE Drawing · 14 Jul 2026 View ↗ PDF FLAT 2B AFFORDABLE Drawing · 14 Jul 2026 View ↗ PDF FLAT 2B OPP AFFORDABLE Drawing · 14 Jul 2026 View ↗ PDF POST RAIL AND FENCE - 900MM Drawing · 14 Jul 2026 View ↗ PDF TIMBER FENCING - 1800MM HIT_MISS Drawing · 14 Jul 2026 View ↗ PDF TIMBER FENCING - 1800MM HIT AND MISS_SLOPING Drawing · 14 Jul 2026 View ↗ PDF BRICK WALL TIMBER FENCE - 1800MM Drawing · 14 Jul 2026 View ↗ PDF BRICK WALL - PIERS - H_M TIMBER INFILL - 1800MM - SL Drawing · 14 Jul 2026 View ↗ PDF LOCATION PLAN Drawing · 25 Jun 2026 View ↗

All documents on the council site ↗

Site constraints 3

Registered battlefield: Battle of Pinkie
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic Environment Scotland ↗
Also on the record
Radon affected area, class 4; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lothian - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval Matters Specified Condition
Received
25 Jun 2026
Validated
18 Aug 2026
Ward
Musselburgh
Parish
Wallyford Community Council
Case officer
Show
Target decision
17 Dec 2026
Applicant
Show
Agent
EMA Architecture + Design Ltd

Decision outlook

Day 52, past East Lothian's usual 46 days for full applications. 94% are decided within thirteen weeks, so most likely by 17 Nov 2026.

Day 5239 days to the 91-day target
80%decided within 8 weeks
96%approved
504decided in the last year

Plota live figures for full applications decided by East Lothian in the last twelve months, from validation. East Lothian decision record →

Consultation & key dates

Neighbours
19 Aug 2026
Consultation
20 Aug 2026
Comments by
20 Sept 2026
Site or press notice
28 Aug 2026
Statutory expiry
17 Dec 2026
Env. assessment
No