East Boldre Village Hall, Main Road, East Boldre, Brockenhurst, SO42 7WD Data via plota.co.uk

25/01128DOC - Discharge of Conditions Approved

Proposal

Application for discharge of condition 3 of planning permission for Replacement windows and doors Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Oct 2025
✓
Consultation
6 Oct 2025
✓
Validated
10 Oct 2025
✓
Approved
10 Nov 2025

Approved on 10 Nov 2025 · Last checked 9 Nov 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 3 discharged

    • ConditionsApplication for discharge of condition 3 of planning permission 24/01108FULLThis application25/01128DOC

Site constraints 14

Surface water flood riskAerodrome safeguarding zoneUnexploded ordnance riskArchaeological interestConservation area
Special area of conservation: The New Forest
3 designations overlap here. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: The New Forest SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Open access land
Open country or registered common land, with a right to roam on foot.
Building on registered common land needs the consent of the Secretary of State as well as planning permission.
Priority habitat: Lowland heathland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Lowland heathland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Unexploded ordnance riskCouncil record
Recorded by the council for this site.
Council site ↗
Archaeological interestCouncil record
Recorded by the council for this site.
Council site ↗
Conservation areaCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area273 m² (2,939 sq ft)
Energy ratingC (asset rating 74)
UseNon-residential Institutions: Community/Day Centre
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in August 2024, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Conditions
Postcode
SO42 7WD
Received
6 Oct 2025
Validated
10 Oct 2025
Parish
East Boldre Parish Council
Case officer
Show
Target decision
1 Dec 2025
Decision
Discharge of Conditions Allowed
Decision date
10 Nov 2025
Applicant
Show

Consultation & key dates

Alt. reference
PP-14383840
Site or press notice
6 Oct 2025
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 councils
Relevant to this application:
Householder decisions

New Forest (Park) is slower than most councils at deciding householder applications, ranking #254 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.