Sennybridge CP School Defynnog Road Sennybridge Brecon Powys LD3 8RS Data via plota.co.uk

25/24210/FUL - Full Application Approved

Proposal

Proposed demolition of the existing primary school and construction of a new school, sports / play facilities, plant and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 12 Nov 2025
✓
Approved
12 Feb 2026

Approved on 12 Feb 2026 · Committee Decision · Last checked 9 Oct 2026

Planning committee

Decided by Brecon Beacons Planning Committee on 10 Feb 2026.

Approved

As officers recommended.

  • Officers advised approval because the replacement school would improve community facilities without increasing pupil or staff numbers and would avoid unacceptable impacts.
  • One representation raised concerns that the acoustic fence would be imposing and would block natural light.
  • Members agreed delegated approval, with four electric vehicle charging points required before occupation.
Read how the committee decided The proposal, site, officers’ assessment, consultation responses, committee discussion, vote and decision. Includes the meeting recording, from 0:05:02 where this application was taken

Source: Plota analysis of Brecon Beacons's committee minutes of 10 Feb 2026.

Documents 176

Statements & assessments 24

PDF Sen-dbs-01-00-d-c-000001 p03 Suds and below ground drainage general arrangement Plan Approved · 22 Jan 2026 View ↗ PDF 332710-r1 (00) dated jun 2020 Preliminary risk assessment SupportingDocs · 20 Jan 2026 View ↗ PDF 09:56 with prelim risk assessment Agent email Correspondence · 20 Jan 2026 View ↗ PDF 322710-r2 (01) dated may 2021 Geo-environmental site assessment SupportingDocs · 20 Jan 2026 View ↗ PDF 09:57 with geo assessment Agent email Correspondence · 20 Jan 2026 View ↗ PDF Dated 22nd december 2025 Ground contamination, controlled waters SupportingDocs · 8 Jan 2026 View ↗ PDF Dated 22nd december 2025 Ground contamination, human health SupportingDocs · 8 Jan 2026 View ↗ PDF Development of land affected by contamination developers guide 2023 Pcccon email ConsulteeResponse · 1 Dec 2025 View ↗ PDF Req for doc - noise design tn Pccep email ConsulteeResponse · 26 Nov 2025 View ↗ PDF 7th november 2025 Biodiversity enhancement plan & green infrastructure statement SupportingDocs · 12 Nov 2025 View ↗ PDF Adp-sennybridge topo a0 3d a Topographical survey Plans · 12 Nov 2025 View ↗ PDF Sen-dbs-01-00-d-c-000002-s2-po2 Suds and below ground drainage proposed surface water layout Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-00-d-c-000003-s2-p01 Suds and below ground drainage proposed foul water layout Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-00-d-c-000004-s2-p01 Suds and below ground drainage demolition plan Plan Approved · 12 Nov 2025 View ↗ PDF P01 Noise design technical note SupportingDocs · 12 Nov 2025 View ↗ PDF October 2025 rev a Planning statement SupportingDocs · 12 Nov 2025 View ↗ PDF September 2025 rev 3 Ecology and bat survey SupportingDocs · 12 Nov 2025 View ↗ PDF October 2025 Transport assessment SupportingDocs · 12 Nov 2025 View ↗ PDF 8th august 25 v2 Archaeological desk based assessment SupportingDocs · 12 Nov 2025 View ↗ PDF Sen-dbs-00-zz-t-a-100800-s2-p01 Design and access statement SupportingDocs · 12 Nov 2025 View ↗ PDF October 2025 Green infrastructure statement SupportingDocs · 12 Nov 2025 View ↗ PDF Page 1-24 Flood consequence assessment SupportingDocs · 12 Nov 2025 View ↗ PDF Page 31-54 Flood consequence assessment SupportingDocs · 12 Nov 2025 View ↗ PDF Page 55-58 Flood consequence assessment SupportingDocs · 12 Nov 2025 View ↗

Plans & drawings 18

PDF 1020_001_p11 Landscape proposals Plan Approved · 22 Jan 2026 View ↗ PDF Sen-dbs-00-00-d-a-100021 p01 Proposed bat house - plan & elevations Plan Approved · 22 Jan 2026 View ↗ PDF F_100-03 Access arrangement Plan Approved · 12 Nov 2025 View ↗ PDF 1020_002_p3 Hard landscape layout and materials Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-00-00-d-a-100000-s2-p02 Site location plan Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-00-00-d-a-100001-s2-p02 Existing site plan Plans · 12 Nov 2025 View ↗ PDF Sen-dbs-00-00-d-a-100010-s2-p03 Proposed site plan Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-00-00-d-a-100020-s2-p02 Proposed external cycle and bin store and meph enclosur Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-00-zz-d-a-100002-s2-p02 Demolition plan Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-00-zz-d-a-100500-s2-p02 Site sections Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-00-d-a-100100-s2-p02 Ground floor ga plan Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-rf-d-a-100120-s2-p02 Roof ga plan Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-zz-d-a-100300-s2-p02 Ga elevations Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-zz-d-a-100301-s2-p02 Ga elevations - without canopies Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-zz-d-a-100400-s2-p02 Ga sections Plan Approved · 12 Nov 2025 View ↗ PDF Sen-dbs-01-zz-d-a-100600-s2-p02 3d isometrics Plans · 12 Nov 2025 View ↗ PDF 1020_003_p3 Soft landscape layout and plant stock Plan Approved · 12 Nov 2025 View ↗ PDF October 2025 Travel plan SupportingDocs · 12 Nov 2025 View ↗

Consultation & comments 76

PDF 10:41 response to agent Officer email Correspondence · 2 Feb 2026 View ↗ PDF Npeco email ConsulteeResponse · 30 Jan 2026 View ↗ PDF Nrw ConsulteeResponse · 29 Jan 2026 View ↗ PDF 10:45 ack agent response Officer email Correspondence · 28 Jan 2026 View ↗ PDF Natgr ConsulteeResponse · 28 Jan 2026 View ↗ PDF 08:26 response to officer Agent email Correspondence · 27 Jan 2026 View ↗ PDF 16:31 23.01.26 response to pccep Officer email Correspondence · 26 Jan 2026 View ↗ PDF 10:44 response to officer Agent email Correspondence · 26 Jan 2026 View ↗ PDF Nptc3 ConsulteeResponse · 23 Jan 2026 View ↗ PDF Npeco email ConsulteeResponse · 23 Jan 2026 View ↗ PDF Pccep email ConsulteeResponse · 23 Jan 2026 View ↗ PDF 10:23 to agent re hse response Officer email Correspondence · 22 Jan 2026 View ↗ PDF 10:37 response to officer Agent email Correspondence · 22 Jan 2026 View ↗ PDF Npeco ConsulteeResponse · 21 Jan 2026 View ↗ PDF 15:22 response to agent Npeco email Correspondence · 21 Jan 2026 View ↗ PDF Pcccon ConsulteeResponse · 20 Jan 2026 View ↗ PDF 12:30 response to agent Officer email Correspondence · 20 Jan 2026 View ↗ PDF Hse comments technical note SupportingDocs · 20 Jan 2026 View ↗ PDF 13:24 response to officer Agent email Correspondence · 20 Jan 2026 View ↗ PDF Hse email ConsulteeResponse · 20 Jan 2026 View ↗ PDF Hse ConsulteeResponse · 20 Jan 2026 View ↗ PDF Pcccon email ConsulteeResponse · 19 Jan 2026 View ↗ PDF 11:26 response to officer Agent email Correspondence · 19 Jan 2026 View ↗ PDF 15:04 response to officer Agent email Correspondence · 19 Jan 2026 View ↗ PDF 10:45 response to agent re pcccon comments Officer email Correspondence · 16 Jan 2026 View ↗ PDF Consultee recon 21 days Correspondence · 16 Jan 2026 View ↗ PDF Consultee recon 21 days Correspondence · 16 Jan 2026 View ↗ PDF 13:50 to pcccon re agent response Officer email Correspondence · 16 Jan 2026 View ↗ PDF Supplied by agent Hse ConsulteeResponse · 15 Jan 2026 View ↗ PDF Nrw email ConsulteeResponse · 15 Jan 2026 View ↗ PDF Pcccon email ConsulteeResponse · 14 Jan 2026 View ↗ PDF 09:26 to agent re. consultee response Officer email Correspondence · 14 Jan 2026 View ↗ PDF Dcww ConsulteeResponse · 14 Jan 2026 View ↗ PDF 09:36 with comments sent 08/12/25 Dcww email Correspondence · 14 Jan 2026 View ↗ PDF For 25/23986/paypre Copy of npbcon comments SupportingDocs · 14 Jan 2026 View ↗ PDF For 25/23986/paypre Copy of npeco comments SupportingDocs · 14 Jan 2026 View ↗ PDF 09:45 to agent re. h&s response Officer email Correspondence · 14 Jan 2026 View ↗ PDF Auto response - confirm email received Hse email Correspondence · 14 Jan 2026 View ↗ PDF Npbcon ConsulteeResponse · 14 Jan 2026 View ↗ PDF Nparch ConsulteeResponse · 13 Jan 2026 View ↗ PDF 16:51 to consultee Officer email Correspondence · 13 Jan 2026 View ↗ PDF Nphsp ConsulteeResponse · 24 Dec 2025 View ↗ PDF Pcchig ConsulteeResponse · 15 Dec 2025 View ↗ PDF Nrw ConsulteeResponse · 3 Dec 2025 View ↗ PDF 11:01 query nrw response Agent email Correspondence · 3 Dec 2025 View ↗ PDF Pcccon email ConsulteeResponse · 1 Dec 2025 View ↗ PDF Pccep email ConsulteeResponse · 1 Dec 2025 View ↗ PDF Wagtw ConsulteeResponse · 27 Nov 2025 View ↗ PDF Mod email ConsulteeResponse · 25 Nov 2025 View ↗ PDF Pccdrn email ConsulteeResponse · 24 Nov 2025 View ↗ PDF Cadw ConsulteeResponse · 21 Nov 2025 View ↗ PDF Mscrcc Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Nrw Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Dcww Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Nparch Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Npbcon Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Npeco Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Nphsp Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Nprow Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pcchig Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pcccon Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pccdrn Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pcceh Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pccep Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Cadw2 Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pccsab Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Wagtw Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Mod Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Pccedu Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Swfs Consultee initial Correspondence · 17 Nov 2025 View ↗ PDF Hre ref hsl-251117112256-433 Hse ConsulteeResponse · 17 Nov 2025 View ↗ PDF Final report Hse ConsulteeResponse · 17 Nov 2025 View ↗ PDF Pcceh email ConsulteeResponse · 17 Nov 2025 View ↗ PDF 12:02 response to agent Officer email Correspondence · 17 Nov 2025 View ↗ PDF 12:31 response to officer Agent email Correspondence · 17 Nov 2025 View ↗ PDF November 2025 rev a Pre-application consultation report SupportingDocs · 12 Nov 2025 View ↗

Other documents 48

PDF 14:43 req update Agent email Correspondence · 11 Feb 2026 View ↗ PDF 15:26 req eot to 12.02.26 (and update) Officer email Correspondence · 11 Feb 2026 View ↗ PDF 15:34 agreed eot Agent email Correspondence · 11 Feb 2026 View ↗ PDF Approved minutes planning committee Minutes · 10 Feb 2026 View ↗ PDF 17:46 03.02.26 to mscrcc re committee Admin manager email Correspondence · 4 Feb 2026 View ↗ PDF Committee notify agent/app Correspondence · 3 Feb 2026 View ↗ PDF 16:10 to agent re committee Admin manager email Correspondence · 3 Feb 2026 View ↗ PDF 10:37 req for update re committee Agent email Correspondence · 2 Feb 2026 View ↗ PDF 11:26 further req re committee Agent email Correspondence · 2 Feb 2026 View ↗ PDF 09:44 with drone view Agent email Correspondence · 28 Jan 2026 View ↗ PDF 10:17 query to agent re image Officer email Correspondence · 28 Jan 2026 View ↗ PDF 10:44 agree to use of image Agent email Correspondence · 28 Jan 2026 View ↗ PDF 17:03 23.01.26 pccep query to agent Officer email Correspondence · 26 Jan 2026 View ↗ PDF 08:36 re aq screening Agent email Correspondence · 26 Jan 2026 View ↗ PDF Dated 19.09.25 req aq screening Copy of agent email SupportingDocs · 26 Jan 2026 View ↗ PDF 10:40 req for further info Officer email Correspondence · 26 Jan 2026 View ↗ PDF 11:14 to pccep Officer email Correspondence · 26 Jan 2026 View ↗ PDF 11:22 ack officer email Pccep email Correspondence · 26 Jan 2026 View ↗ PDF 14:31 req for clarity Officer email Correspondence · 26 Jan 2026 View ↗ PDF Nutrient screening Phosphate Screening · 23 Jan 2026 View ↗ PDF 15:48 to pccep Officer email Correspondence · 23 Jan 2026 View ↗ PDF 12:11 with supporting info Agent email Correspondence · 22 Jan 2026 View ↗ PDF 14:58 to nrw - hra screening and aa Npeco email Correspondence · 22 Jan 2026 View ↗ PDF 13:53 query to npeco/head of dm Agent email Correspondence · 21 Jan 2026 View ↗ PDF 08:45 req for meeting Agent email Correspondence · 20 Jan 2026 View ↗ PDF Dated 20 january 2026 Hse advice to agent SupportingDocs · 20 Jan 2026 View ↗ PDF 14:09 to officer re hse advice Agent email Correspondence · 20 Jan 2026 View ↗ PDF 14:19 req for clarity Officer email Correspondence · 19 Jan 2026 View ↗ PDF Hse link in agent email SupportingDocs · 19 Jan 2026 View ↗ PDF 10:14 to nrw Npeco email Correspondence · 15 Jan 2026 View ↗ PDF 13:37 update re pcccon email Agent email Correspondence · 15 Jan 2026 View ↗ PDF 09:38 ack to dcww Officer email Correspondence · 14 Jan 2026 View ↗ PDF Hse technical note SupportingDocs · 14 Jan 2026 View ↗ PDF 17:14 13.01.26 with attachments Agent email Correspondence · 14 Jan 2026 View ↗ PDF 09:59 to officer re. h&s Agent email Correspondence · 14 Jan 2026 View ↗ PDF 10:55 to hse Officer email Correspondence · 14 Jan 2026 View ↗ PDF 16:47 to dcww Officer email Correspondence · 13 Jan 2026 View ↗ PDF 08:01 with reports Agent email Correspondence · 8 Jan 2026 View ↗ PDF 13:26 req for meeting Officer email Correspondence · 7 Jan 2026 View ↗ PDF 16:01 req for update Agent email Correspondence · 6 Jan 2026 View ↗ PDF Public notice Publicity · 26 Nov 2025 View ↗ PDF 13:36 tn to pccep Admin email Correspondence · 26 Nov 2025 View ↗ PDF Applicant agent acknowledgement feb23 Correspondence · 17 Nov 2025 View ↗ PDF 11:33 update to officer Agent email Correspondence · 17 Nov 2025 View ↗ PDF 16:42 with docs Agent email Correspondence · 13 Nov 2025 View ↗ PDF 784-b049243 dated october 2025 Ground investigation report SupportingDocs · 13 Nov 2025 View ↗ PDF 7th november 2025 Tree report SupportingDocs · 12 Nov 2025 View ↗ PDF Cover letter SupportingDocs · 12 Nov 2025 View ↗

All documents on the council site ↗

Associated applications 4

Site constraints 6

Nutrient neutrality catchment: River Usk
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Brecon Beacons National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Special area of conservation about 211 m away: River Usk / Afon Wysg
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
SSSI about 211 m away: River Usk (Upper Usk) / Afon Wysg (Wysg Uchaf); 1 listed building within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brecon Beacons - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
LD3 8RS
Received
around 12 Nov 2025
Validated
12 Nov 2025
Case officer
Show
Target decision
12 Feb 2026
Decision
Permit
Decision date
12 Feb 2026
Decision level
Committee Decision
Agent
Asbri Planning Ltd.
Freehold owner
Show

How this decision compares

Decided in 92 days from validation, 23 days slower than Brecon Beacons's median of 69 for full applications. Approved, as 88% of full applications here are.

40%decided within 8 weeks
88%approved
5%go to committee

Plota live figures for full applications decided by Brecon Beacons in the last twelve months, from validation. Brecon Beacons decision record →

Public comments

1comment received
1 neutral

13 neighbours consulted · Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
8 Dec 2025
Env. assessment
No

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.