Hanger 6,, South Perimter Road,, Gatwick Airport,, Crawley,, RH6 0NP Data via plota.co.uk

MO/2026/01617 - Consultation from Neighbouring Authority Live

Proposal

Consultation for the demolition of the existing Hangar 6 building, pump house and water tanks, to accommodate 530 valet car parking spaces (Consultation from Crawley Borough Council to be determined under their ref: ). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Validated
22 Oct 2026
✓
Received
23 Oct 2026
Decision
Target date was 12 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 12 Jan 2027 and 23 Jan 2027, from Mole Valley's recent commercial and major works.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Parts of the Urban District of Dorking · Land in the County of Surrey. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Gatwick Airport Northern Runway
The site is inside the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hookwood built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Mole Valley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Consultation from Neighbouring Authority
Postcode
RH6 0NP
Received
23 Oct 2026
Validated
22 Oct 2026
Case officer
Show
Target decision
12 Nov 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 32 of the 56-day target. Mole Valley usually decides commercial and major works by day 85.

Day 3253 days to the predicted decision (day 85)
14%decided within 8 weeks
89%approved
24%go to committee

Plota live figures for commercial and major works decided by Mole Valley in the last twelve months, from validation. Mole Valley decision record →

Consultation & key dates

Alt. reference
EC/2026/01637
Committee
23 Oct 2026
Statutory expiry
12 Nov 2026
Env. assessment
No
Mole Valley
Planning Authority Score
2.1/10
Poor
#270 of 296 overall
Relevant to this application:
Householder decisions

Mole Valley is slower than most councils at deciding householder applications: #240 of 296 on speed. Mole Valley is also one of the strictest councils - it refuses more householder applications than almost any other, with only 76% approved vs 90% nationally.

One of the strictest councils
only 76% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Mole Valley decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #291 of 296
76%
Householder approved
Below avg (90%) #291 of 296
50%
Decided in 8 weeks
Below avg (63%) #240 of 296
43%
Extended time limit
Above avg (41%) #172 of 296
47%
Minor dwellings approved
114 decided (1-9 homes)
71%
Major dwellings approved
7 decided (10+ homes)
93%
Change of use approved
15 decided
913
Total decisions
259 refused in the year to March 2026