Greenland Dock Rope Street London Southwark Data via plota.co.uk

25/AP/2436 - Certificate of Lawful Dev. - Proposed Approved

Proposal

Certificate of Lawfulness (proposed) for installation of replacement pontoons and pilings to Greenland Dock (including the upgrading of mechanical and electrical infrastructure). The number of pontoons will remain as existing, but the pilings will be increased from 3 to 7. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Aug 2025
✓
Validated
5 Sept 2025
✓
Approved
3 Oct 2025

Approved on 3 Oct 2025 · Delegated Panel - Simple · Last checked 12 Oct 2026

Site constraints 12

Listed building: Greenland lock including gates, bollards and capstans
The pin is inside its outline · 5 more listed buildings within 150 m (5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 5 with distances
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 753 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Local nature reserve 373 m away: Russia Dock Woodland; Thames Path 30 m away; Inside the Southwark built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square; Flood defence 35 m away (wall, designed for a 1 in 1000 year flood).
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Certificate of Lawful Dev. - Proposed
Received
22 Aug 2025
Validated
5 Sept 2025
Ward
Surrey Docks
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
30 Oct 2025
Decision
Certificate of Lawfulness Prop- GRANTED
Decision date
3 Oct 2025
Decision level
Delegated Panel - Simple
Applicant
Show
Agent
Fuller Long

How this decision compares

Decided in 28 days from validation, 21 days faster than Southwark's median of 49 for lawful development certificates. Approved, as 95% of lawful development certificates here are.

86%decided within 8 weeks
95%approved
211decided in the last year

Plota live figures for lawful development certificates decided by Southwark in the last twelve months, from validation. Southwark decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
30 Oct 2025
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 overall
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications: #54 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026