Land West Of Treviscoe Dryers Barton Lane Central Treviscoe St Austell Cornwall PL26 7QN Data via plota.co.uk

PA26/04506 - Full application Awaiting decision

Proposal

Proposed development of a 20 MW electrolytic green hydrogen production facility (the Hydrogen Site), together with a separate Electrical Connection Compound, associated underground electrical infrastructure, hydrogen pipeline connections and ancillary works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 13 Aug 2026
✓
Consultation
3 Sept 2026
Decision
Expected by 12 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 57.

The consultation period closed on 24 Sept 2026.

Documents 34

Statements & assessments 28

PDF Commenter’s name hidden Show Representations Received · 11 Sept 2026 View ↗
PDF OUTLINE DRAINAGE STRATEGY AND FLOOD RISK SCREENING NOTE Assessment - Flood Risk · 6 Aug 2026 View ↗ PDF EAST-10394-109-CIV-SHT1OF1-00P DRAINAGE AND SITE LEVELS GENERAL ARRANGEMENT Plan - Drainage · 6 Aug 2026 View ↗ PDF STATUTORY BNG METRIC Biodiversity Net Gain · 16 Jul 2026 View ↗ PDF FOUL DRAINAGE ASSESSMENT FORM Assessment - Foul Drainage · 16 Jul 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Assessment - Noise Impact · 29 Jun 2026 View ↗ PDF TECHNICAL APPENDIX 4 - REPTILE SURVEY REPORT Assessment - Ecological · 29 Jun 2026 View ↗ PDF TECHNICAL APPENDIX 1 - BREEDING BIRD SURVEY REPORT Assessment - Ecological · 29 Jun 2026 View ↗ PDF TECHNICAL APPENDIX 2 - BAT SURVEY REPORT 18.06.26 Assessment - Ecological · 29 Jun 2026 View ↗ PDF CONDITION ASSESSMENTS Biodiversity Net Gain · 29 Jun 2026 View ↗ PDF LVIA Assessment - Landscape · 29 Jun 2026 View ↗ PDF LVIA - AP2 FIGURES Assessment - Landscape · 29 Jun 2026 View ↗ PDF LVIA - AP3 REPRESENTATIVE VIEWS Assessment - Landscape · 29 Jun 2026 View ↗ PDF LVIA - AP3 SITE Assessment - Landscape · 29 Jun 2026 View ↗ PDF CONSTRUCTION TRAFFIC MANAGEMENT PLAN Assessment - Transport · 29 Jun 2026 View ↗
PDF Commenter’s name hidden Show Statement - Community Involvement · 29 Jun 2026 View ↗
PDF PRELIMINARY SITE RISK ASSESSMENT PART 1 Assessment - Land Contamination · 29 Jun 2026 View ↗ PDF PRELIMINARY SITE RISK ASSESSMENT PART 2 Assessment - Land Contamination · 29 Jun 2026 View ↗ PDF TRANSPORT ADVISORY NOTE Assessment - Transport · 29 Jun 2026 View ↗ PDF OUTLINE DRAINAGE STRATEGY AND FLOOD RISK SCREENING NOTE FOR ELECTRICAL CONNECTIO Assessment - Flood Risk · 29 Jun 2026 View ↗ PDF FLOOD RISK ASSESSMENT Assessment - Flood Risk · 29 Jun 2026 View ↗ PDF C5631-GC-C-102-PD DRAINAGE Plan - Drainage · 29 Jun 2026 View ↗ PDF ECOLOGICAL IMPACT ASSESSMENT Assessment - Ecological · 29 Jun 2026 View ↗ PDF TECHNICAL APPENDIX 3 - DORMOUSE SURVEY REPORT 23.06.26 Assessment - Ecological · 29 Jun 2026 View ↗ PDF BNG STRATEGY Biodiversity Net Gain · 29 Jun 2026 View ↗ PDF TECHNICAL APPENDIX 2 - BAT SURVEY REPORT 23.06.26 Assessment - Ecological · 29 Jun 2026 View ↗ PDF TREE SURVEY, AIA AND TREE CANOPY COVER ASSESSMENT Tree Survey/Report · 29 Jun 2026 View ↗ PDF PLANNING STATEMENT INCLUDING DESIGN, ACCESS AND GI STATEMENTS Statement - Planning · 29 Jun 2026 View ↗

Consultation & comments 4

PDF Commenter’s name hidden Show Representations Received · 3 Sept 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 2 Sept 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 2 Sept 2026 View ↗
PDF Commenter’s name hidden Show Representations Received · 17 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 6

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Nature recovery project: G7 Legacy; National infrastructure project 27 m away: The Trelavour Lithium Project, at pre-application; Priority habitat 45 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Full application
Postcode
PL26 7QN
Received
around 13 Aug 2026
Validated
13 Aug 2026
Ward
St Stephen-In-Brannel
Parish
St. Stephen-in-Brannel
Case officer
Show
Target decision
12 Nov 2026
Applicant
Show
Agent
Collaborative Planning

Decision outlook

Day 57, past the statutory target. 89% of commercial and major works in Cornwall are decided within thirteen weeks, which runs to 12 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 571 days past the 56-day target
75%decided within 8 weeks
95%approved
191decided in the last year

Plota live figures for commercial and major works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14913571
Planning Portal ref
PP-14913571
Comments by
24 Sept 2026
Site or press notice
3 Sept 2026
Statutory expiry
12 Nov 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026