Hazel Cottage Northampton Road Weston On The Green Oxfordshire OX25 3QX Data via plota.co.uk

26/01574/LB - Listed Building Approved

Proposal

Extend existing chimney stone work by 225mm and add new clay roll top pot. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jun 2026
✓
Validated
7 Jul 2026
✓
Approved
1 Sept 2026

Approved on 1 Sept 2026 · Delegated · Last checked 7 Sept 2026

Site constraints 7

11 listed buildings within 150 m of the postcode pin
Nearest: Hazel Cottage, Grade II, about 4 m from the postcode pin · 11 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 11 with distances
Historic England ↗
Weston on the Green conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1433 m away: Oxfordshire Strategic Rail Freight Interchange; Inside the Weston-on-the-Green built-up area; Green belt about 36 m away: Oxford; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cherwell - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cherwell
Application type
Listed Building
Postcode
OX25 3QX
Received
23 Jun 2026
Validated
7 Jul 2026
Ward
Launton And Otmoor
Parish
Weston On The Green
Target decision
1 Sept 2026
Decision
Permitted
Decision date
1 Sept 2026
Decision level
Delegated

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 92% of extensions here are.

58%decided within 8 weeks
92%approved
443decided in the last year

Plota live figures for extensions decided by Cherwell in the last twelve months, from validation. Cherwell decision record →

Consultation & key dates

Comments by
6 Aug 2026
Cherwell
Planning Authority Score
3.6/10
Below average
#214 of 296 councils
Relevant to this application:
Other decisions

Cherwell is slower than most councils at deciding householder applications, ranking #247 out of 296. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cherwell decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #77 of 296
94%
Householder approved
Above avg (90%) #101 of 296
47%
Decided in 8 weeks
Below avg (63%) #247 of 296
49%
Extended time limit
Above avg (41%) #218 of 296
77%
Minor dwellings approved
117 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
96%
Change of use approved
47 decided
1,091
Total decisions
90 refused in the year to March 2026