Telecommunication Mast 140255, Pantyrhiw Road, Burry Port Data via plota.co.uk

PL/11576 - Full planning permission In Review

Proposal

Upgrades to the existing telecoms mast (Resubmission of PL/10572 Refused 23/09/2026) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Oct 2026
✓
Validated
26 Oct 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Dec 2026 and 25 Jan 2027, from Carmarthenshire's recent full applications.

Site constraints 4

Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4; Coalfield, development low risk area; National infrastructure project 1.2 km away: Gwynt Glas Offshore Wind Farm, at pre-application.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Received
22 Oct 2026
Validated
26 Oct 2026
Ward
Pembrey
Parish
Pembrey and Burry Port Town
Case officer
Show
Target decision
21 Dec 2026

Decision outlook

Day 28 of the 56-day target. Carmarthenshire usually decides full applications by day 76.

Day 2848 days to the predicted decision (day 76)
35%decided within 8 weeks
78%approved
394decided in the last year

Plota live figures for full applications decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →