Homefield And Land North of Homefield Fifield Road Bray Maidenhead Data via plota.co.uk

26/02621/FULL - Full Awaiting decision

Proposal

Demolition of existing buildings and erection of 52 residential dwellings (Class C3), together with landscaping, access arrangements, car parking, and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
✓
Validated
9 Nov 2026
Decision
Expected by 8 Feb 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 2 Jan 2027, from Windsor and Maidenhead's recent demolitions.

Comments are open until 8 Dec 2026

Comment on this application ↗

Documents 31

Statements & assessments 17

PDF Preliminary risk assessment (phase 1 desk study) Supporting Information - General · 26 Oct 2026 View ↗ PDF Flood risk assessment Supporting Information - Flood Risk · 26 Oct 2026 View ↗ PDF Design and access statement part 1 Design and Access Statement · 26 Oct 2026 View ↗ PDF Archaeological desk-based assessment: homefield, bray Archaelogical Statement · 26 Oct 2026 View ↗ PDF Design and access statement part 2 Design and Access Statement · 26 Oct 2026 View ↗ PDF Energy and sustainability statement Supporting Information - General · 26 Oct 2026 View ↗ PDF Energy and sustainability statement appendix 1 - gla carbon emission reporting s Supporting Information - General · 26 Oct 2026 View ↗ PDF Arboricultural impact assessment Supporting Information - Arboricultural report · 26 Oct 2026 View ↗ PDF Sustainable drainage strategy SUDS & drainage · 26 Oct 2026 View ↗ PDF Transport statement Supporting Information - Transport · 26 Oct 2026 View ↗ PDF Bat emergence report Supporting Information - Ecology · 26 Oct 2026 View ↗ PDF Biodiversity net gain assessment Supporting Information - Ecology · 26 Oct 2026 View ↗ PDF Soil infiltration testing SUDS & drainage · 26 Oct 2026 View ↗ PDF Preliminary ecological appraisal Supporting Information - Ecology · 26 Oct 2026 View ↗ PDF Noise impact assessment report 1812.nia.02 Supporting Information - General · 26 Oct 2026 View ↗ PDF Reptile presence/likely absence survey 2026 Supporting Information - Ecology · 26 Oct 2026 View ↗ PDF Planning statement Planning Statement · 26 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 6

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1.3 km away: M4 Junctions 3 to 12 Smart Motorway; SSSI 493 m away: Bray Pennyroyal Field SSSI; Inside the Maidenhead built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 13 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
SL6 2DY
Received
26 Oct 2026
Validated
9 Nov 2026
Ward
Bray
Parish
Bray Parish
Target decision
8 Feb 2027
Applicant
Show

Decision outlook

Day 14 of the 91-day target. Windsor and Maidenhead usually decides demolitions by day 54.

Day 1477 days to the 91-day target
74%decided within 8 weeks
74%approved
227decided in the last year

Plota live figures for demolitions decided by Windsor and Maidenhead in the last twelve months, from validation. Windsor and Maidenhead decision record →

Consultation & key dates

Alt. reference
PP-15320973
Planning Portal ref
PP-15320973
Comments by
8 Dec 2026
Statutory expiry
8 Feb 2027
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 overall
Relevant to this application:
Householder decisions

Windsor and Maidenhead is faster than most councils at deciding householder applications: #82 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026