Factory adjacent Ocean House West Quay Road Southampton SO15 1GZ Data via plota.co.uk

26/00926/FUL - Full Application Awaiting decision

Proposal

External alterations to existing car dealership including a parapet to the north east elevation, cladding to the north west and south east elevations, increased display parking and demolition of existing MOT work shop.(submitted in conjunction with application 26/00927/ADV). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Aug 2026
✓
Consultation
20 Aug 2026
Decision
Expected by 14 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Oct 2026, from Southampton's recent commercial and major works.

The consultation period closed on 10 Sept 2026.

Associated applications 2

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Special protection area 243 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
National infrastructure project 665 m away: Solent Gateway 2, at pre-application; Inside the Southampton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO15 1GZ
Received
19 Aug 2026
Validated
19 Aug 2026
Ward
Bargate
Case officer
Show
Target decision
14 Oct 2026
Applicant
Show
Agent
Boyle & Summers Ltd

Decision outlook

Day 51 of the 56-day target. Southampton usually decides commercial and major works by day 56.

Day 515 days to the 56-day target
52%decided within 8 weeks
88%approved
25decided in the last year

Plota live figures for commercial and major works decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
6487
Neighbours
20 Aug 2026
Consultation
20 Aug 2026
Comments by
10 Sept 2026
Statutory expiry
14 Oct 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Householder decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026