29 Middle Market Road (land outside), Great Yarmouth, NR30 2DS Data via plota.co.uk

06/26/0609/TEL - Telecom 28 Day Enquiry Approved

Proposal

Notification of proposal to install a 12m light wooden pole as fixed line broadband apparatus on land outside 29 Middle Market Road, Great Yarmouth. Data via plota.co.uk

View original council record ↗Last checked

Great Yarmouth Borough Council is publishing its applications late: so far it has put about half of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
29 Jul 2026
✓
Approved
18 Aug 2026

Approved on 18 Aug 2026 · Officer Delegated Decision · Last checked 20 Nov 2026

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Article 4 Direction - Houses in Multiple Occupation Great Yarmouth. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project 450 m away: Great Yarmouth Third River Crossing
The site is 450 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Redmere Wind Farm (at pre-application, 1.1 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
4 listed buildings within 150 m; Scheduled monument 215 m away: Town walls; Conservation area 67 m away: No.2 Market Place, Rows & North Quay Extension; Heritage at risk 66 m away: Market Place, Rows and North Quay; Inside the Great Yarmouth built-up area.
Not affected
Not green belt

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Great Yarmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecom 28 Day Enquiry
Postcode
NR30 2DS
Received
29 Jul 2026
Validated
29 Jul 2026
Ward
Central & Northgate
Parish
GY Central/Northgate
Case officer
Show
Target decision
26 Aug 2026
Decision
No Objection
Decision date
18 Aug 2026
Decision level
Officer Delegated Decision
Applicant
Show
Agent
S Balasuramaniam

How this decision compares

Decided in 20 days from validation, 18 days faster than Great Yarmouth's median of 38 for prior approvals. Approved, as 88% of prior approvals here are.

86%decided within 8 weeks
88%approved
69decided in the last year

Plota live figures for prior approvals decided by Great Yarmouth in the last twelve months, from validation. Great Yarmouth decision record →

Great Yarmouth
Planning Authority Score
4.4/10
Below average
#181 of 296 overall
Relevant to this application:
Householder decisions

Great Yarmouth is #125 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Great Yarmouth decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #171 of 296
92%
Householder approved
Above avg (90%) #154 of 296
69%
Decided in 8 weeks
Above avg (63%) #125 of 296
49%
Extended time limit
Above avg (41%) #221 of 296
69%
Minor dwellings approved
51 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
89%
Change of use approved
18 decided
366
Total decisions
47 refused in the year to March 2026