Eastney Community Centre Bransbury Park Bransbury Road Southsea PO4 9SU Data via plota.co.uk

25/01326/DOC - Discharge of Condition Awaiting decision

Proposal

Application to seek approval of details pursuant to conditions 3 (Materials), 4 (Boundary Treatment), 9 (Ecological enhancement measures) and 17 (Refuse and recycling facilities) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2025
✓
Consultation
20 Nov 2025
Decision
Target date was 5 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 373.

Associated applications 5

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 350 m away: AQUIND Interconnector
The site is 350 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, 517 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area584 m² (6,286 sq ft)
Energy ratingC (asset rating 61)
UseD1 Non-residential Institutions - Community/Day Centre
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Discharge of Condition
Postcode
PO4 9SU
Received
10 Nov 2025
Validated
10 Nov 2025
Ward
Milton
Case officer
Show
Target decision
5 Jan 2026
Decision level
Delegated
Applicant
Show
Agent
GT3 Architects

Decision outlook

Day 373, past the statutory target. 74% of discharge of conditions in Portsmouth are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 15 Nov 2026.

Day 373317 days past the 56-day target
53%decided within 8 weeks
100%approved
80decided in the last year

Plota live figures for discharge of conditions decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

Last counted 15 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14477079
Planning Portal ref
PP-14477079
Consultation
20 Nov 2025
Statutory expiry
5 Jan 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.