Footbridge Over Railway At Priory Drive Kingston Upon Hull Data via plota.co.uk

26/00890/FULL - Full Planning Permission Pending Consideration

Proposal

Proposed phased replacement of the existing concrete footbridge, comprising: Phase 1: Demolition of the existing concrete footbridge. Phase 2: Erection of a new steel footbridge with stepped access only. Phase 3: Installation of accessible ramps to serve the new footbridge. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2026
✓
Validated
21 Sept 2026
Decision
Expected by 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 15 Nov 2026, from Hull's recent demolitions.

Comments are open until 29 Oct 2026

Comment on this application ↗

Documents 27

All documents on the council site ↗

Site constraints 2

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Kingston upon Hull built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Full Planning Permission
Postcode
HU5 5XT
Received
17 Sept 2026
Validated
21 Sept 2026
Case officer
Show
Agent
Innovation Architecture Ltd

Decision outlook

Day 18 of the 56-day target. Hull usually decides demolitions by day 55.

Day 1838 days to the 56-day target
61%decided within 8 weeks
94%approved
35decided in the last year

Plota live figures for demolitions decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

52 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15117157
Planning Portal ref
PP-15117157
Comments by
29 Oct 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 councils
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications, ranking #231 out of 296. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026