26/0953 - Full Application Approved

Proposal

Full planning application for the proposed change of use of ground floor office areas (Use class E(c)(ii)) into new engineering training academy facilities (Use class F1) and proposed installation of eight new external flues and two extraction units to serve the new training bays. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Sept 2026
✓
Approved
20 Nov 2026

Approved on 20 Nov 2026 · Last checked 20 Nov 2026

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 32 m from the postcode pin (reference 400300-091).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Air quality management area: Walsall AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 4; Nature improvement area: Birmingham and the Black Country; Inside the Bloxwich built-up area; Priority habitat about 31 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Walsall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Walsall
Application type
Full Application
Postcode
WS2 7BN
Received
10 Sept 2026
Validated
10 Sept 2026
Ward
Beechdale, Leamore & Reedswood
Case officer
Show
Target decision
5 Nov 2026
Decision
Grant Permission Subject to Conditions
Decision date
20 Nov 2026
Applicant
Show
Agent
Fisch Planning

How this decision compares

Decided in 71 days from validation, about the council's usual 73 days. Approved, as 78% of changes of use here are.

29%decided within 8 weeks
78%approved
56decided in the last year

Plota live figures for changes of use decided by Walsall in the last twelve months, from validation. Walsall decision record →

Walsall
Planning Authority Score
2.1/10
Poor
#271 of 296 overall
Relevant to this application:
Change of use

Walsall is slower than most councils at deciding householder applications: #228 of 296 on speed. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Walsall decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #230 of 296
89%
Householder approved
Below avg (90%) #213 of 296
52%
Decided in 8 weeks
Below avg (63%) #228 of 296
56%
Extended time limit
Above avg (41%) #257 of 296
66%
Minor dwellings approved
95 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
60%
Change of use approved
48 decided
800
Total decisions
128 refused in the year to March 2026