Advertising Bus Shelter 2709-0068 Osborne Road, Outside 96, Southsea Shops Stop A, Southsea Portsmouth PO5 3HL Data via plota.co.uk

25/00759/ADV - Advert Application Approved

Proposal

Display of 2no. internally illuminated double-sided digital displays Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jul 2025
✓
Validated
3 Jul 2025
✓
Consultation
23 Jul 2025
✓
Approved
21 Aug 2025

Approved on 21 Aug 2025 · Fully Delegated Decision · Last checked 16 Oct 2026

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Public footpath 22 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Conservation area 20 m away: Owen's Southsea
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
4 listed buildings within 150 m; Registered park or garden 205 m away: Southsea Common; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Advert Application
Postcode
PO5 3HL
Received
2 Jul 2025
Validated
3 Jul 2025
Ward
St Jude
Case officer
Show
Target decision
28 Aug 2025
Decision
Conditional Consent
Decision date
21 Aug 2025
Decision level
Fully Delegated Decision
Applicant
Show

How this decision compares

Decided in 49 days from validation, 5 days faster than Portsmouth's median of 54 for signs and adverts. Approved, as 94% of signs and adverts here are.

64%decided within 8 weeks
94%approved
67decided in the last year

Plota live figures for signs and adverts decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

110 neighbours consulted · Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14102103
Planning Portal ref
PP-14102103
Neighbours
23 Jul 2025
Consultation
23 Jul 2025
Comments by
15 Aug 2025
Site or press notice
23 Jul 2025
Statutory expiry
28 Aug 2025
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Other decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026