Courtlands Cabin, Courtlands Road, Tavistock, PL19 0EF Data via plota.co.uk

0400/25/FUL - Full Planning Application Within Consultation Period

Proposal

Erection of shed for office use and staff space (Retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Feb 2025
✓
Validated
10 Sept 2026
Decision
Expected by 5 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Oct 2026, from West Devon's recent extensions.

Comments are open until 26 Oct 2026

Comment on this application ↗

Documents 26

All documents on the council site ↗

Site constraints 4

Local nature reserve about 195 m away: Tavistock Viaduct Walk
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
World heritage site about 110 m away: Cornwall and West Devon Mining Landscape; Inside the Tavistock built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
West Devon
Application type
Full Planning Application
Postcode
PL19 0EF
Received
11 Feb 2025
Validated
10 Sept 2026
Ward
Tavistock North
Parish
Tavistock
Case officer
Show
Applicant
Show

Decision outlook

Day 29 of the 56-day target. West Devon usually decides extensions by day 49.

Day 2927 days to the 56-day target
85%decided within 8 weeks
85%approved
110decided in the last year

Plota live figures for extensions decided by West Devon in the last twelve months, from validation. West Devon decision record →

Consultation & key dates

Consultation
21 Sept 2026
Comments by
26 Oct 2026