Unit I70 Queensway Gateshead Data via plota.co.uk

21/00801/DOC5 - Discharge of Condition Approved

Proposal

Discharge of condition 29 (external lighting) of planning application . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2025
✓
Approved
28 Oct 2025

Approved on 28 Oct 2025 · Last checked 12 Oct 2026

Associated applications 4

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 662 m away: A1 Birtley to Coal House Improvement Scheme
The site is about 662 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Flood defence about 4 m from the postcode pin (natural high ground, designed for a 1 in 2 year flood); Coalfield, development low risk area; Inside the Gateshead built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gateshead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gateshead
Application type
Discharge of Condition
Received
16 Sept 2025
Validated
16 Sept 2025
Ward
Lobley Hill And Bensham
Case officer
Show
Target decision
11 Nov 2025
Decision
Approve
Decision date
28 Oct 2025
Agent
Lichfields

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
7 Oct 2025
Statutory expiry
11 Nov 2025
Env. assessment
No
Gateshead
Planning Authority Score
2.4/10
Poor
#255 of 296 overall
Relevant to this application:
Householder decisions

Gateshead is one of the slowest councils in England for householder decisions: #289 of 296 on speed. The council extends the time limit on 67% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Gateshead decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #130 of 296
94%
Householder approved
Above avg (90%) #107 of 296
26%
Decided in 8 weeks
Below avg (63%) #289 of 296
67%
Extended time limit
Above avg (41%) #282 of 296
58%
Minor dwellings approved
24 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
70%
Change of use approved
37 decided
482
Total decisions
54 refused in the year to March 2026