Land East of New Lane and West of Warblington School Data via plota.co.uk

APP/26/00618 - Non-Material Amendment Under Consultation

Proposal

Non Material Amendment to to replace approved plans to reflect the revised adoptable pumping station arrangement shown in Drawing 7167-MJA-PSTN-XX-DR-C-001 Rev P1 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
Decision
Expected by 1 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 1 Oct 2026.

Site constraints 7

Grade II listed: Warblington Secondary School
List entry 1459138 · The pin is inside its outline · 2 more listed buildings within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
  • 0 mWarblington Secondary School, Southleigh Road, Havant, Hampshire
  • 145 m10, Southleigh RoadGrade II
Historic England ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
0164B3. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
Radon affected area, class 4; National infrastructure project 1714 m away: Hampshire Water Transfer and Water Recycling Project; Inside the Havant built-up area; National landscape 497 m away: Chichester Harbour.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Non-Material Amendment
Received
3 Sept 2026
Validated
3 Sept 2026
Case officer
Show
Target decision
1 Oct 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Havant
Planning Authority Score
3/10
Poor
#235 of 296 councils
Relevant to this application:
Householder decisions

Havant is one of the slowest councils in England for householder decisions, ranking #283 out of 296. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026