Grosvenor House Fore Street Grampound Truro Cornwall TR2 4SE Data via plota.co.uk

PA25/09125 - Listed Building Consent Approved

Proposal

Listed Building Consent for replacing old guttering on front aspect of property with conservation heritage plastic and stainless steel fixings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Jan 2026
✓
Consultation
20 Jan 2026
✓
Approved
9 Mar 2026

Approved on 9 Mar 2026 · Peer Sign Off · Last checked 24 Sept 2026

Site constraints 9

Grade II listed: House Attached to West of April Cottage
List entry 1312749 · 1 m away · 43 more listed buildings within 150 m (1 Grade II*, 42 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 43 with distances
Historic England ↗
Grampound conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Grampound
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument 37 m away: Market Cross and cross base immediately south west of St Nun's Church
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Public footpath 23 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Nature recovery project: G7 Legacy; Inside the Grampound built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Listed Building Consent
Postcode
TR2 4SE
Received
around 16 Jan 2026
Validated
16 Jan 2026
Ward
St Mewan And Grampound
Parish
Grampound With Creed
Case officer
Show
Target decision
13 Mar 2026
Decision
Approved with conditions
Decision date
9 Mar 2026
Decision level
Peer Sign Off
Applicant
Show

How this decision compares

Decided in 52 days from validation, about the council's usual 55 days. Approved, as 99% of listed building works here are.

75%decided within 8 weeks
99%approved
353decided in the last year

Plota live figures for listed building works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
20 Jan 2026
Consultation
20 Jan 2026
Comments by
17 Feb 2026
Site or press notice
27 Jan 2026
Statutory expiry
13 Mar 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Other decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026