The Stewards Flat New Whale Hill Club Birchington Avenue Eston Middlesbrough TS6 8HA Data via plota.co.uk

R/2026/0574/FF - Full Valid

Proposal

Attached garage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Validated
18 Aug 2026
Decision
Expected by 13 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 12 Oct 2026, from Redcar and Cleveland's recent extensions.

The consultation period closed on 24 Sept 2026.

Site constraints 3

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 1038 m away: Tees CCPP
The site is about 1038 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: East Coast Hydrogen Teesside Pipeline (at pre-application, about 1155 m); H2NorthEast (H2NE) (at pre-application, about 1273 m); H2Teesside (withdrawn, about 1920 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Eston built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
TS6 8HA
Received
17 Aug 2026
Validated
18 Aug 2026
Case officer
Show
Decision level
Sch 1 DELEGATED
Applicant
Show

Decision outlook

Day 52 of the 56-day target. Redcar and Cleveland usually decides extensions by day 55.

Day 524 days to the 56-day target
74%decided within 8 weeks
95%approved
158decided in the last year

Plota live figures for extensions decided by Redcar and Cleveland in the last twelve months, from validation. Redcar and Cleveland decision record →

Consultation & key dates

Consultation
20 Aug 2026
Comments by
24 Sept 2026
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 councils
Relevant to this application:
Householder decisions

Redcar and Cleveland ranks #169 out of 296 councils for householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026