Land North East Of Park Place Pastoral Centre Winchester Road Wickham Hampshire Data via plota.co.uk

25/01371/FUL - Full Application Approved

Proposal

Erection of classroom dome to service kindergarten. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2025
✓
Validated
18 Aug 2025
✓
Approved
12 Mar 2026

Approved on 12 Mar 2026 · Committee Decision · Last checked 16 Oct 2026

Planning committee

Decided by Winchester Planning Committee on 11 Mar 2026.

Approved

As officers recommended.

  • Officers advised permission because the dome would support the kindergarten without harming character, neighbours or heritage assets.
  • The parish council and two objectors raised concerns, while eight supporters backed the classroom and its materials.
  • The committee agreed to grant permission, adding a condition limiting use to the existing kindergarten.
Read how the committee decided The proposal, site history, officers’ assessment, public views, committee debate, vote, decision and conditions. Includes the meeting recording, from 2:37:51 where this application was taken

Source: Plota analysis of Winchester's committee minutes of 11 Mar 2026.

Documents 31

Consultation & comments 11

PDF Objector’s name hidden Show Public Comment · 20 Oct 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 6 Oct 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 3 Oct 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 3 Oct 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 2 Oct 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 1 Oct 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 30 Sept 2025 View ↗
PDF Supporter’s name hidden Show Public Comment · 30 Sept 2025 View ↗
PDF Commenter’s name hidden Show Public Comment · 30 Sept 2025 View ↗
PDF Objector’s name hidden Show Public Comment · 25 Sept 2025 View ↗
PDF WCC _ ENV HEALTH Consultee Comment · 23 Sept 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 269 m away: Hampshire Water Transfer and Water Recycling Project
The site is 269 m from the project boundary. Dam or reservoir, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Inside the Wickham built-up area; Priority habitat 25 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Full Application
Received
7 Jul 2025
Validated
18 Aug 2025
Ward
SOUTHWICK AND WICKHAM WARD
Parish
Wickham And Knowle
Case officer
Show
Target decision
13 Oct 2025
Decision
Application Permitted
Decision date
12 Mar 2026
Decision level
Committee Decision
Applicant
Show
Agent
Chapman Lily Planning Ltd

How this decision compares

Decided in 206 days from validation, 122 days slower than Winchester's median of 84 for full applications. Approved, as 86% of full applications here are.

22%decided within 8 weeks
86%approved
5%go to committee

Plota live figures for full applications decided by Winchester in the last twelve months, from validation. Winchester decision record →

Consultation & key dates

Alt. reference
PP-14131836
Planning Portal ref
PP-14131836
Statutory expiry
13 Oct 2025
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 councils
Relevant to this application:
Householder decisions

Winchester is slower than most councils at deciding householder applications, ranking #213 out of 296. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026