6 The Square Anmer Norfolk Data via plota.co.uk

26/01523/NT28 - Notification (28 days) Approved

Proposal

The Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus - Installation of Subtended Headend Sidepod onto existing BT cabinet - Hillington PCP 5 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Sept 2026
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Last checked 24 Sept 2026

Site constraints 4

Nutrient neutrality catchment: River Wensum SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 684 m away: Norwich Northern Distributor Road (NDR)
The site is 684 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Taverham and Drayton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kings Lynn - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Kings Lynn
Application type
Notification (28 days)
Received
14 Sept 2026
Validated
14 Sept 2026
Ward
Dersingham
Parish
Anmer - VACANT
Target decision
12 Oct 2026
Decision
No Comments
Decision date
21 Sept 2026
Applicant
Show

How this decision compares

Decided in 7 days from validation, 5 days faster than Kings Lynn's median of 12 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

86%decided within 8 weeks
98%approved
93decided in the last year

Plota live figures for utility and infrastructure works decided by Kings Lynn in the last twelve months, from validation. Kings Lynn decision record →

Public comments

No public comments yet.

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
12 Oct 2026
Env. assessment
No
Kings Lynn
Planning Authority Score
8.4/10
Excellent
#17 of 296 overall
Relevant to this application:
Householder decisions

Kings Lynn is one of the fastest councils in England for householder decisions: #20 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Kings Lynn decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #133 of 296
95%
Householder approved
Above avg (90%) #82 of 296
87%
Decided in 8 weeks
Above avg (63%) #20 of 296
27%
Extended time limit
Below avg (41%) #41 of 296
76%
Minor dwellings approved
261 decided (1-9 homes)
85%
Major dwellings approved
26 decided (10+ homes)
89%
Change of use approved
44 decided
1,216
Total decisions
131 refused in the year to March 2026