SMD/2026/0498 - Full - Householder Consultations/Re-consultations issued

Proposal

Two Storey Rear Extension to provide Sun Lounge, Double Bedroom with ensuite and relocated animal housing and associated external alterations. Single storey double replacement garage plus storage space built into the embankment. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Oct 2026
✓
Validated
29 Oct 2026
Decision
Expected by 24 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Dec 2026 and 10 Jan 2027, from Staffordshire Moorlands's recent extensions.

The consultation period closed on 20 Nov 2026.

Site constraints 8

Green belt: Stoke-on-Trent
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Public footpath about 25 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; SSSI about 441 m away: Roe Park Woods SSSI; Priority habitat about 21 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Staffordshire Moorlands - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full - Householder
Postcode
ST7 3PL
Received
28 Oct 2026
Validated
29 Oct 2026
Case officer
Show
Target decision
24 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
BP Architecture Ltd

Decision outlook

Day 27 of the 56-day target. Staffordshire Moorlands usually decides extensions by day 64.

Day 2737 days to the predicted decision (day 64)
39%decided within 8 weeks
80%approved
186decided in the last year

Plota live figures for extensions decided by Staffordshire Moorlands in the last twelve months, from validation. Staffordshire Moorlands decision record →

Consultation & key dates

Consultation
30 Oct 2026
Comments by
20 Nov 2026
Staffordshire Moorlands
Planning Authority Score
0.4/10
Poor
#296 of 296 overall
Relevant to this application:
Householder decisions

Staffordshire Moorlands is one of the slowest councils in England for householder decisions: #277 of 296 on speed. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Staffordshire Moorlands is also one of the strictest councils - it refuses more householder applications than almost any other, with only 76% approved vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Staffordshire Moorlands decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #283 of 296
76%
Householder approved
Below avg (90%) #292 of 296
36%
Decided in 8 weeks
Below avg (63%) #277 of 296
66%
Extended time limit
Above avg (41%) #280 of 296
59%
Minor dwellings approved
41 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
75%
Change of use approved
36 decided
396
Total decisions
94 refused in the year to March 2026