26/02224/LBC - Listed Building Consent Awaiting decision

Proposal

Consent for works associated to the replacement of the boiler, upgrades to the plant room, removal of an internal door, alterations to an external door, and alterations to the external chimney stack, pots and flue. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Sept 2026
✓
Validated
28 Sept 2026
Decision
Expected by 22 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 20 Nov 2026, from Windsor and Maidenhead's recent listed building works.

Site constraints 7

Scheduled monument: Bisham Abbey: a monastic and manorial complex
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Grade I listed: Bisham Abbey
List entry 1303584 · 10 m away · 4 more listed buildings within 150 m (1 Grade I, 3 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Windsor and Maidenhead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
SL7 1RR
Received
9 Sept 2026
Validated
28 Sept 2026
Ward
Bisham And Cookham
Parish
Bisham Parish
Case officer
Show
Target decision
22 Nov 2026
Applicant
Show

Decision outlook

Day 11 of the 56-day target. Windsor and Maidenhead usually decides listed building works by day 53.

Day 1145 days to the 56-day target
69%decided within 8 weeks
91%approved
61decided in the last year

Plota live figures for listed building works decided by Windsor and Maidenhead in the last twelve months, from validation. Windsor and Maidenhead decision record →

Consultation & key dates

Alt. reference
PP-15203258
Planning Portal ref
PP-15203258
Statutory expiry
22 Nov 2026
Env. assessment
No
Windsor and Maidenhead
Planning Authority Score
5.3/10
Average
#135 of 296 councils
Relevant to this application:
Other decisions

Windsor and Maidenhead is faster than most councils at deciding householder applications, ranking #82 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Windsor and Maidenhead is also one of the strictest councils - it refuses more householder applications than almost any other, with only 74% approved vs 90% nationally.

One of the strictest councils
only 74% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Windsor and Maidenhead decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #293 of 296
74%
Householder approved
Below avg (90%) #294 of 296
75%
Decided in 8 weeks
Above avg (63%) #82 of 296
28%
Extended time limit
Below avg (41%) #47 of 296
44%
Minor dwellings approved
156 decided (1-9 homes)
96%
Major dwellings approved
27 decided (10+ homes)
64%
Change of use approved
25 decided
1,530
Total decisions
434 refused in the year to March 2026