29 Tite Street and Land to the West of the National Army Museum, London, SW3 Data via plota.co.uk

PP/25/04989 - Planning Permission Withdrawn

Proposal

***WITHDRAWN***Demolition of existing care home and convent buildings, structures and hardstanding to provide a mixed-use redevelopment comprising 42 new homes (Use Class C3) within a new six to four storey building (with double basement), together with associated amenity, storage, car and cycle parking, substation and plant, landscaping and open space, and other associated works plus a basement extension to the west of the National Army Museum (Use Class F1) and an associated publicly-accessible garden. [MAJOR DEVELOPMENT; AND DEVELOPMENT AFFECTING THE SETTING OF CONSERVATION AREAS AND THE SETTING OF LISTED BUILDINGS] Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2025
−
Withdrawn
20 Apr 2026

Withdrawn on 20 Apr 2026 · Last checked 23 Oct 2026

Site constraints 11

Royal Hospital conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 387 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
22 listed buildings within 150 m of the postcode pin
Nearest: 34, Tite Street Sw3, Grade II, about 28 m from the postcode pin · 1 Grade I, 5 Grade II*, 15 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 22 with distances
Historic England ↗
Registered park or garden about 102 m away: ROYAL HOSPITAL, CHELSEA and RANELAGH GARDENS
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Permission
Received
30 Sept 2025
Validated
30 Sept 2025
Ward
Royal Hospital
Case officer
Show
Target decision
30 Dec 2025
Decision
Withdrawn
Decision date
20 Apr 2026
Applicant
Show

Consultation & key dates

Comments by
14 Nov 2025
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 overall
Relevant to this application:
Householder decisions

Kensington and Chelsea is #174 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions