Engineering Works Front Street Ireshopeburn Bishop Auckland DL13 1HB Data via plota.co.uk

Pending Consideration DM/26/02218/PA56
Council
Date received
25 Aug 2026
Date validated
25 Aug 2026
Postcode
DL13 1HB

Description

Erection of a general purpose agricultural building. Juniper green plastisol roof sheets, Juniper green ventair vertical sheets and self coloured concrete panel lower walls Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 16 Oct 2026, from Durham's recent agricultural works.

Day 21 of the 56-day target. Durham usually decides agricultural works by day 52.

Day 2135 days to the 56-day target
76%decided within 8 weeks
66%approved
49decided in the last year

Plota live figures for agricultural works decided by Durham in the last twelve months, from validation. Durham decision record →

Site constraints 4

North Pennines National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Ireshopeburn, Newhouse and West Blackdene conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Durham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Durham
Planning Authority Score
5.2/10
Average
#137 of 296 councils
Relevant to this application:
Householder decisions

Durham ranks #190 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Durham decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #52 of 296
97%
Householder approved
Above avg (90%) #29 of 296
59%
Decided in 8 weeks
Below avg (63%) #190 of 296
48%
Extended time limit
Above avg (41%) #213 of 296
79%
Minor dwellings approved
95 decided (1-9 homes)
90%
Major dwellings approved
49 decided (10+ homes)
87%
Change of use approved
201 decided
1,706
Total decisions
113 refused in the year to March 2026