Peter Ward Homes Development Site High Stile Leven East Riding Of Yorkshire HU17 5NL Data via plota.co.uk

26/01880/PLF - Full Planning Permission Pending Consideration

Proposal

Erection of electrical substation for residential development Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
21 Jul 2026
Validated
29 Jul 2026
Decision
Expected by 23 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 21 Sept 2026, from East Riding's recent utility and infrastructure works. Comments are open until 17 Sept 2026.

Comment on this application ↗

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Inside the Leven (East Riding of Yorkshire) built-up area; Tree preservation order 29 m away: Leven No. 13 - 2005; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
HU17 5NL
Received
21 Jul 2026
Validated
29 Jul 2026
Ward
Beverley Rural
Parish
Leven Parish Council
Case officer
Show
Applicant
Show
Agent
Sangwin Architects

Decision outlook

Day 48 of the 56-day target. East Riding usually decides utility and infrastructure works by day 54.

Day 488 days to the 56-day target
78%decided within 8 weeks
91%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15091623
Comments by
17 Sept 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026