5 Wiltshire Road, Bransgore BH23 8BH Data via plota.co.uk

25/10587 - Full Planning Permission Approved

Proposal

Side and rear extensions; new roof to facilitate creation of second floor; rear dormer Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Jun 2025
✓
Validated
27 Jun 2025
✓
Consultation
30 Jun 2025
✓
Approved
11 Sept 2025

Approved on 11 Sept 2025 · Development Control Committee · Last checked 22 Oct 2026

Documents 23

Other documents 15

PDF OFFICERS REPORT Reports · 2 Sept 2025 View ↗
PDF Commenter’s name hidden Show Representees · 22 Aug 2025 View ↗
PDF EXTENSION OF TIME AGREEMENT Applications Processing · 22 Aug 2025 View ↗
PDF Commenter’s name hidden Show Representees · 21 Aug 2025 View ↗
PDF Commenter’s name hidden Show Representees · 21 Aug 2025 View ↗
PDF Commenter’s name hidden Show Representees · 21 Aug 2025 View ↗
PDF Commenter’s name hidden Show Representees · 11 Aug 2025 View ↗
PDF Commenter’s name hidden Show Representees · 1 Aug 2025 View ↗
PDF Commenter’s name hidden Show Representees · 31 Jul 2025 View ↗
PDF Commenter’s name hidden Show Representees · 31 Jul 2025 View ↗
PDF Commenter’s name hidden Show Representees · 30 Jul 2025 View ↗
PDF Commenter’s name hidden Show Representees · 29 Jul 2025 View ↗
PDF Commenter’s name hidden Show Representees · 15 Jul 2025 View ↗
PDF Commenter’s name hidden Show Representees · 14 Jul 2025 View ↗
PDF INITIAL BRIEFING FROM CASE OFFICER Applications Processing · 8 Jul 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 8

Nutrient neutrality catchment: River Avon SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 336 m away: Navitus Bay Wind Park
The site is 336 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m; National park 302 m away: New Forest; Inside the Bransgore built-up area; Green belt 78 m away: South West Hampshire; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £579,950 in September 2022. Detached house, freehold.

14 September 2022£579,950

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area116 m² (1,249 sq ft)
Energy ratingD (61 out of 100), could reach C
PropertyDetached bungalow, 5 habitable rooms
Built1983 to 1990
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in April 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
BH23 8BH
Received
20 Jun 2025
Validated
27 Jun 2025
Ward
Bransgore, Burley, Sopley & Ringwood Eas
Parish
Bransgore
Case officer
Show
Target decision
12 Sept 2025
Decision
Granted Subject to Conditions
Decision date
11 Sept 2025
Decision level
Development Control Committee
Applicant
Show
Agent
Elmwood Architectural Services Ltd

How this decision compares

Decided in 76 days from validation, 23 days slower than New Forest (District)'s median of 53 for full applications. Approved, as 92% of full applications here are.

66%decided within 8 weeks
92%approved
746decided in the last year

Plota live figures for full applications decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

7comments received
3 objecting1 neutral3 supporting

43% support · above the UK average of 16%

10 neighbours consulted · Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14108216
Planning Portal ref
PP-14108216
Consultation
30 Jun 2025
Comments by
31 Jul 2025
Committee
10 Sept 2025
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 overall
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications: #37 of 296 on speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.