West End Bridge West End Hebden Bridge Calderdale Data via plota.co.uk

25/01111/LBC - Listed Building Consent Approved

Proposal

Temporary dismantling of the parapet over the northern arch of the west span, Stainless steel rods will be inserted into spandrels and arch, parapet then rebuilt in its existing layout with suitable mortar. (Listed Building Consent) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Oct 2025
✓
Consultation
4 Nov 2025
✓
Approved
17 Feb 2026

Approved on 17 Feb 2026 · Committee Decision · Last checked 10 Oct 2026

Planning committee

Decided by Calderdale Planning Committee on 17 Feb 2026.

Approved

As officers recommended.

  • Officers advised approval because the works would cause no harm and help protect the bridge during flooding.
  • Historic England had no comments, conservation officers and the town council had no objections, and no public representations were received.
  • The committee granted listed building consent in accordance with the officer recommendation.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, and committee decision. Includes the meeting recording

Source: Plota analysis of Calderdale's committee minutes of 17 Feb 2026.

Site constraints 13

Grade II listed: West End Bridge over the Hebden Water
List entry 1230445 · The pin is inside its outline · 9 more listed buildings within 150 m (1 Grade II*, 8 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 9 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Hebden Bridge conservation area
Also Hebden Bridge. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Calderdale AQMA No.3 (Hebden Bridge)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Public footpath 25 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Scheduled monument 117 m away: The old bridge over the Hebden Water at Hebden Bridge
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Nature recovery project: Bradford and South Pennines; Radon affected area, class 3; Flood defence 8 m away (bridge abutment, designed for a 1 in 20 year flood); Inside the Hebden Bridge built-up area; National infrastructure project 1521 m away: Calderdale Energy Park, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 5, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Calderdale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Calderdale
Application type
Listed Building Consent
Received
29 Oct 2025
Validated
29 Oct 2025
Ward
Hebden Bridge And Todmorden East
Parish
Hebden Royd Town Council
Case officer
Show
Target decision
27 Feb 2026
Decision
Grant Listed Building Consent
Decision date
17 Feb 2026
Decision level
Committee Decision
Applicant
Show
Agent
Mott Macdonald

How this decision compares

Decided in 111 days from validation, 55 days slower than Calderdale's median of 56 for listed building works. Approved, as 89% of listed building works here are.

52%decided within 8 weeks
89%approved
7%go to committee

Plota live figures for listed building works decided by Calderdale in the last twelve months, from validation. Calderdale decision record →

Public comments

No public comments yet.

Last counted 10 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14415007
Planning Portal ref
PP-14415007
Consultation
4 Nov 2025
Comments by
4 Dec 2025
Site or press notice
6 Nov 2025
Committee
17 Feb 2026
Statutory expiry
24 Dec 2025
Env. assessment
No
Calderdale
Planning Authority Score
2.7/10
Poor
#240 of 296 councils
Relevant to this application:
Other decisions

Calderdale ranks #193 out of 296 councils for householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Calderdale decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #192 of 296
87%
Householder approved
Below avg (90%) #229 of 296
58%
Decided in 8 weeks
Below avg (63%) #193 of 296
50%
Extended time limit
Above avg (41%) #223 of 296
73%
Minor dwellings approved
103 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
61 decided
856
Total decisions
121 refused in the year to March 2026