18 Melrose Gardens, London, W6 7RW Data via plota.co.uk

P/2026/02806/HH - Householder Application REGISTERED: Under Consultation

Proposal

Increasing the ridge height of the main roof by 400mm; erection of enlarged dormer windows to replace the existing dormer windows in the rear roofslope; erection of a single storey rear extension; installation of 2no rooflights to replace 1no existing rooflight in the front roofslope; raising the height of the parapet walls and installation of 2no air conditioning units with acoustic enclosure above the roof of second floor rear back addition; replacement of 1no existing window with a new window at second floor level to the rear elevation; alterations to the roof of ground floor rear back addition to include the replacement of existing rooflights with new rooflights. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Oct 2026
✓
Validated
9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 16 Jan 2027 and 1 Feb 2027, from Hammersmith and Fulham's recent extensions.

Comments are open until 9 Dec 2026

Comment on this application ↗

Documents 32

Plans & drawings 23

PDF 2561-EX-203_P01 Drawing · 6 Nov 2026 View ↗ PDF 2561-PP-203_P01 Drawing · 6 Nov 2026 View ↗ PDF 2561-PP-301_P03.pdf Proposed Drawings · 31 Oct 2026 View ↗ PDF Elevation (Rear) - Proposed_included_in_Elevation (Side) - Proposed.pdf Proposed Drawings · 31 Oct 2026 View ↗ PDF Elevation (Front) - Proposed_included_in_Elevation (Side) - Proposed.pdf Proposed Drawings · 31 Oct 2026 View ↗ PDF 2561-PP-201_P02.pdf Proposed Drawings · 31 Oct 2026 View ↗ PDF 2561-PP-102_P03.pdf Drawing · 31 Oct 2026 View ↗ PDF 2561-PP-101_P03.pdf Drawing · 31 Oct 2026 View ↗ PDF 2561-PP-001_P01.pdf Drawing · 31 Oct 2026 View ↗ PDF Layout Plan - Proposed_included_in_Floor plan.pdf Proposed Drawings · 31 Oct 2026 View ↗ PDF Layout Plan - Proposed_included_in_Floor plan_39713930.pdf Proposed Drawings · 31 Oct 2026 View ↗ PDF 2561-EX-301_P01.pdf Drawing · 31 Oct 2026 View ↗ PDF Elevation (Rear) - Existing_included_in_Elevation (Side) - Existing.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF Elevation (Front) - Existing_included_in_Elevation (Side) - Existing.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF 2561-EX-201_P01.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF 2561-EX-102_P01.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF Floor Plan - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF 2561-EX-101_P01.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF Floor Plan - Existing_included_in_Layout Plan - Existing_39714136.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF 2561-EX-001_P01.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF The location plan_included_in_SiteBlock Plan - Existing.pdf Drawing · 31 Oct 2026 View ↗ PDF Roof Plan - Existing_included_in_Layout Plan - Existing.pdf Existing Drawings · 31 Oct 2026 View ↗ PDF Roof Plan - Proposed_included_in_Floor plan.pdf Proposed Drawings · 31 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Melrose conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 787 m away: Thames Tideway Tunnel
The site is 787 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £2,400,000 in September 2023. Terraced house, freehold.

1 September 2023£2,400,000
10 December 1996£345,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area224 m² (2,411 sq ft)
Energy ratingD (60 out of 100), could reach C
PropertyMid-terrace house, 7 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in August 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder Application
Postcode
W6 7RW
Received
31 Oct 2026
Validated
9 Nov 2026
Ward
Addison
Case officer
Show
Applicant
Show

Decision outlook

Day 10 of the 56-day target. Hammersmith and Fulham usually decides extensions by day 76.

Day 1066 days to the predicted decision (day 76)
24%decided within 8 weeks
98%approved
509decided in the last year

Plota live figures for extensions decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
10 Nov 2026
Comments by
9 Dec 2026
Site or press notice
18 Nov 2026
Statutory expiry
4 Jan 2027
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.