Victoria And Albert Chambers Posterngate Kingston Upon Hull HU1 2JN Data via plota.co.uk

25/01069/CONDET - Discharge of condtions Approved

Proposal

Discharge of conditions 3, 4, 5, 6 and 7 of approval ref 25/00338/LBC (Listed Building Consent for:- 1. Refurbishment of roofscape, including repairs to chimneys and finials, installation of new membrane, replacement battens, leadwork and reclaimed Welsh slate and brickwork; 2. Refurbishment of facades, including restoration and replacement rainwater goods, repointing to affected masonry, replacement reclaimed brickwork and window repairs, 3. High level link corridor to be re-roofed and concrete repairs carried out to the link support structure). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Nov 2025
✓
Approved
9 Dec 2025

Approved on 9 Dec 2025 · Delegated Decision · Last checked 8 Oct 2026

Associated applications 3

Site constraints 9

70 listed buildings within 150 m
Nearest: 6, Posterngate, Grade II, 3 m away · 1 Grade I, 4 Grade II*, 65 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 70 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Old Town conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Air quality management area: Hull AQMA No.1(A)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 19 m away: A63 Castle Street Improvement-Hull
The site is 19 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 96 m away: Beverley Gate and adjacent archaeological remains forming part of Hull's medieval and post-medieval defences
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Special area of conservation 453 m away: Humber Estuary; SSSI 453 m away: Humber Estuary - 2000480 SSSI; Inside the Kingston upon Hull built-up area.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Discharge of condtions
Postcode
HU1 2JN
Received
17 Nov 2025
Validated
17 Nov 2025
Ward
St Andrews And Dockland
Case officer
Show
Decision
Conditions Discharged
Decision date
9 Dec 2025
Decision level
Delegated Decision

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
EM
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026