The Ridge Copse Bury Gate Bury West Sussex RH20 1HA Data via plota.co.uk

SDNP/26/00822/OHL - Overhead Electricity Lines Application Determined

Proposal

Replacement of 2 no. wooden electricity poles and stays on 11kV circuit. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Feb 2026
Decision
Target date was 10 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 269.

Documents 5

Consultation & comments 1

PDF Commenter’s name hidden Show General Comment · 17 Mar 2026 View ↗

All documents on the council site ↗

Site constraints 4

South Downs National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Ancient Semi Natural Woodland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 28 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area527 m² (5,673 sq ft)
Energy ratingF (32 out of 100), could reach D
PropertyDetached house, 13 habitable rooms
Built1930 to 1949
HeatingBoiler and radiators, wood logs
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in April 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Electricity Lines
Postcode
RH20 1HA
Received
27 Feb 2026
Validated
27 Feb 2026
Ward
Fittleworth Ward CH
Parish
Bury Parish Council
Case officer
Show
Target decision
10 Apr 2026
Decision level
LA Delegated Decision
Applicant
Show

Decision outlook

Day 269, past the statutory target. 79% of utility and infrastructure works in South Downs are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 18 Nov 2026.

Day 269213 days past the 56-day target
60%decided within 8 weeks
97%approved
127decided in the last year

Plota live figures for utility and infrastructure works decided by South Downs in the last twelve months, from validation. South Downs decision record →

Public comments

1comment received
1 neutral

1 neighbour consulted · Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
10 Apr 2026
Env. assessment
No

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.