Morrisons Northwick Road Canvey Island Essex SS8 0SW Data via plota.co.uk

26/0499/ADV - Application to Display Advertisments Registered

Proposal

Erection of internally illuminated 7-meter EV totem sign Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2026
✓
Validated
16 Oct 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 6 Dec 2026, from Castle Point's recent advertisement consent.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Tilbury to Southend across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 205 m away: Canvey Wick SSSI; Nature improvement area: Greater Thames Marshes; Inside the Canvey Island built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area6,734 m² (72,484 sq ft)
Energy ratingC (asset rating 67)
UseRetail/Financial and Professional Services
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in September 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Castle Point - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Application to Display Advertisments
Postcode
SS8 0SW
Received
1 Sept 2026
Validated
16 Oct 2026
Ward
Canvey Island Central
Case officer
Show
Target decision
11 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
MBH Design Studio Ltd

Decision outlook

Day 26 of the 56-day target. Castle Point usually decides advertisement consent by day 51.

Day 2630 days to the 56-day target
69%decided within 8 weeks
77%approved
23%go to committee

Plota live figures for advertisement consent decided by Castle Point in the last twelve months, from validation. Castle Point decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 5 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15195895
Planning Portal ref
PP-15195895
Statutory expiry
11 Dec 2026
Env. assessment
No
Castle Point
Planning Authority Score
7.1/10
Good
#56 of 296 councils
Relevant to this application:
Other decisions

Castle Point is one of the fastest councils in England for householder decisions, ranking #4 out of 296. Only 10% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Castle Point is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Castle Point decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #270 of 296
84%
Householder approved
Below avg (90%) #254 of 296
96%
Decided in 8 weeks
Above avg (63%) #4 of 296
10%
Extended time limit
Below avg (41%) #2 of 296
56%
Minor dwellings approved
39 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
58%
Change of use approved
24 decided
385
Total decisions
83 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.