Land At Dene Park Industrial Estate Stratford Road Wellesbourne Data via plota.co.uk

26/02783/TEL28 - Telecommunication Apparatus 28 Day Det. Pending Consideration

Proposal

The proposal is to install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone. Description of Development: Removal of 4.51 headframe and replacement with 4.9V headframe Removal of existing and installation of 6no. antennas, 2no. 300mm dishes and ERS units, Internal cabin works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Nov 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Dec 2026 and 15 Dec 2026, from Stratford on Avon's recent prior approvals.

The consultation period closed on 16 Nov 2026.

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 8 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Flood defence 9 m away (natural high ground); Inside the Wellesbourne built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 16 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stratford on Avon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecommunication Apparatus 28 Day Det.
Received
4 Nov 2026
Validated
4 Nov 2026
Ward
Wellesbourne South
Parish
Wellesbourne & Walton
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show

Decision outlook

Day 19 of the 56-day target. Stratford on Avon usually decides prior approvals by day 36.

Day 1937 days to the 56-day target
85%decided within 8 weeks
89%approved
185decided in the last year

Plota live figures for prior approvals decided by Stratford on Avon in the last twelve months, from validation. Stratford on Avon decision record →

Consultation & key dates

Consultation
16 Nov 2026
Comments by
16 Nov 2026
Stratford on Avon
Planning Authority Score
5.5/10
Average
#121 of 296 overall
Relevant to this application:
Householder decisions

Stratford on Avon is #142 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Stratford on Avon decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #94 of 296
95%
Householder approved
Above avg (90%) #93 of 296
67%
Decided in 8 weeks
Above avg (63%) #142 of 296
42%
Extended time limit
Above avg (41%) #166 of 296
82%
Minor dwellings approved
146 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
87%
Change of use approved
53 decided
1,257
Total decisions
98 refused in the year to March 2026