Church Farm Church Lane Friston Suffolk IP17 1PS Data via plota.co.uk

DC/26/1204/DRC - Approval of Details Reserved by Cond. Approved

Proposal

Discharge of condition Nos. 6, 8, 9, 10, 11, 12, 13, 14, 17 and 23 of DC/25/2817/FUL - Change of use from agriculture to residential and the construction of a new self build, single dwelling within the frame of an existing agricultural dutch barn in the village of Friston - 6. Surface Water, 8. Ecology, 9. Lighting, 10. Nesting Birds, 11. Construction Environmental Management Plan, 12. Ecological Enhancement Strategy, 13. Materials, 14. Scheme of Archaeological Evaluation, 17. Water Efficiency, 23. ASHP Compliance Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Mar 2026
✓
Validated
1 Apr 2026
✓
Approved
20 May 2026

Approved on 20 May 2026 · Delegated Decision · Last checked 15 Oct 2026

Documents 18

All documents on the council site ↗

Associated applications 2

Site constraints 5

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 15 m away: Sea Link
The site is 15 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: East Anglia ONE North Offshore Windfarm (decided, 20 m); East Anglia TWO Offshore Windfarm (decided, 20 m); The Sizewell C Project (decided, 1 km); LionLink Interconnector (at pre-application, 655 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Public bridleway 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
2 listed buildings within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Cond.
Postcode
IP17 1PS
Received
27 Mar 2026
Validated
1 Apr 2026
Ward
Aldeburgh And Leiston
Parish
Friston
Case officer
Show
Target decision
27 May 2026
Decision
Application Permitted
Decision date
20 May 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
27 May 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 overall
Relevant to this application:
Change of use

East Suffolk is #183 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026