Wreaks End Causeway Bridge On the A595 West Broughton LA20 Data via plota.co.uk
Proposal
Listed Building Consent for the repair of a damaged 2m section of the downstream parapet wall east of centre. Remove damaged material and reconstruct using available original material. A new coping stone approximately 900mm in length to replace on damaged beyond repair. Removal of sawn cut copings to be replaced by new riven slate copings. Replace sawn cut slate copings on 2.8m downstream parapet extension constructed in September 2025 with the Broughton Moor riven slate Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 25 Nov 2026 and 14 Dec 2026, from Westmorland and Furness's recent listed building works.
Documents 6
Statements & assessments 2
Plans & drawings 2
Application forms 1
Site constraints 7
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.
Important details
- Council
- Westmorland and Furness
- Application type
- Listed Building Consent
- Received
- 23 Sept 2026
- Validated
- 25 Sept 2026
- Ward
- High Furness
- Parish
- Kirkby Ireleth, Duddon
- Case officer
- Show
- Decision level
- Delegated
- Applicant
- Show
- Agent
- Westmorland & Furness Council
Decision outlook
Day 59 of the 56-day target. Westmorland and Furness usually decides listed building works by day 69.
Plota live figures for listed building works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →
Consultation & key dates
- Consultation
- 29 Sept 2026
- Comments by
- 29 Oct 2026
- Site or press notice
- 30 Sept 2026
- Statutory expiry
- 20 Nov 2026
Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Track this application
Wreaks End Causeway Bridge On the A595 West Broughton LA20
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 29 Oct 2026.