Sharnbrook House 61 Marchbank Road London W14 9PL Data via plota.co.uk

2024/03122/FR3 - Full Regulation 3 - LBHF is Developer Approved

Proposal

Erection of a single storey GRP (Glass Reinforced Plastic) Quadratank to accommodate a new sprinkler system, including a sprinkler tank and pump set, to be located externally at ground floor level adjacent to the eastern elevation of Sharnbrook House. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Dec 2024
✓
Validated
29 Jul 2025
✓
Approved
24 Oct 2025

Approved on 24 Oct 2025 · Last checked 19 Oct 2026

Associated applications 2

  • Full2024/03122/FR3This application
    Erection of a single storey GRP (Glass Reinforced Plastic) Quadratank to accommodate a new sprinkler system…

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 885 m away: Thames Tideway Tunnel
The site is 885 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 1958 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Town centre 96 m away: Fulham Town Centre.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Regulation 3 - LBHF is Developer
Postcode
W14 9PL
Received
6 Dec 2024
Validated
29 Jul 2025
Ward
West Kensington
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
24 Oct 2025
Applicant
Show

How this decision compares

Decided in 87 days from validation, 10 days slower than Hammersmith and Fulham's median of 77 for full applications. Approved, as 98% of full applications here are.

28%decided within 8 weeks
98%approved
758decided in the last year

Plota live figures for full applications decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
30 Jul 2025
Comments by
23 Sept 2025
Site or press notice
6 Aug 2025
Statutory expiry
24 Oct 2028
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026