250 Kennington Lane And 2-10 Dolland Street London Borough Of Lambeth London Data via plota.co.uk

25/01316/OBS - Application for obs to adj boroughs Decided

Proposal

Request for a Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for a proposed development comprising demolition of existing buildings and construction of a ground plus 7 storey purpose built student accommodation (PBSA) scheme to provide approximately 175 PBSA units. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Feb 2025
Decision
Target date was 18 Mar 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 636.

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Lambeth AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 58 m away: Thames Tideway Tunnel
The site is about 58 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 513 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Wider setting of protected view 4A.2 Primrose Hill summit to the Palace of Westminster; Inside the Lambeth built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 9 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Application for obs to adj boroughs
Received
25 Feb 2025
Validated
25 Feb 2025
Case officer
Show
Target decision
18 Mar 2025
Decision level
Delegated Decision
Applicant
Show
Agent
London Borough Of Lambeth

Decision outlook

Day 636, past the statutory target. 95% of eia screening and scoping opinions in Westminster are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 18 Nov 2026.

Day 636580 days past the 56-day target
86%decided within 8 weeks
97%approved
2,089decided in the last year

Plota live figures for eia screening and scoping opinions decided across the UK in the last twelve months, from validation; too few recent eia screening and scoping opinions in Westminster to go on. Westminster decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 overall
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications: #258 of 296 on speed. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026