Unit 1-3 6 Mollison Avenue Enfield EN3 7XQ Data via plota.co.uk
Proposal
Erection of replacement, employment floorspace for a flexible range of uses (within Classes E(g)(iii) Light Industrial, B2 General Industrial and / or B8 Storage & Distribution) with ancillary offices, together with all other associated works. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 126.
Documents 30
Statements & assessments 20
Plans & drawings 4
Application forms 3
Site constraints 8
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Enfield - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
(former 1082) 25 Mollison Avenue Enfield EN3 7NJ
Installation of signs, comprising of internally illuminated 2 x fascia signs (A ...
Unit 5 The Arena 1004 Mollison Avenue Enfield EN3 7NL
Installation of solar panels to roof.
Unit 3 The Arena 1004 Mollison Avenue Enfield EN3 7NL
Installation of solar panels to roof.
Unit 8 The Arena 1004 Mollison Avenue Enfield EN3 7NL
Installation of solar panels to roof.
Nearby new applications
29 Chestnut Road Enfield EN3 6SX
Change of use from Use Class C3 (dwelling house) to a Class Sui Generis (HMO - h...
Land adjacent to 44 Arlington Crescent Waltham Cross Hertfordshire EN8 7RN
Erection of two storey building comprising a car repair garage and office space ...
Land at Arlington Crescent Waltham Cross Hertfordshire EN8 7AA
Installation of 2no. DC rapid electric vehicle chargers serving four dedicated E...
Land at Arlington Crescent Waltham Cross Hertfordshire EN8 7AA
Advertisement consent for the installation of one 2.1m freestanding pole support...
29 Chestnut Road Enfield EN3 6SX
Two single storey rear extensions 6m deep x 3m high (3m high to eaves).
29 Chestnut Road Enfield EN3 6SX
Single storey rear and side extension with rear dormer, outrigger dormer, front ...
Important details
Decision outlook
Day 126, past the statutory target. 92% of commercial and major works in Enfield are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.
Plota live figures for commercial and major works decided by Enfield in the last twelve months, from validation. Enfield decision record →
Public comments
No public comments yet.
10 neighbours consulted · Last counted 22 Nov 2026
Consultation & key dates
- Alt. reference
- PP-14713155
- Planning Portal ref
- PP-14713155
- Neighbours
- 23 Jul 2026
- Consultation
- 11 May 2026
- Comments by
- 13 Aug 2026
- Site or press notice
- 20 May 2026
- Statutory expiry
- 19 Oct 2026
- Env. assessment
- No
Historical activity at this location
11 nearby applications on record - archival context, not part of the live application.
Nearby activity
Enfield is one of the fastest councils in England for householder decisions: #15 of 296 on speed. Only 5% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Enfield is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.
Track this application
Unit 1-3 6 Mollison Avenue Enfield EN3 7XQ
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 13 Aug 2026.