Forestry building at Little Thyme, Calfstock Lane, Farningham

Summary of planning committee decision

Decided by Sevenoaks Development Management Committee on 12 Nov 2026.

26/01949/FULApproved

What was proposed

The application sought retrospective permission for a forestry building differing from the previously approved storage building in its windows, rooflights and internal layout.

“2 This application seeks retrospective planning permission for the erection of a forestry building. A forestry building was approved on the site under 20/01319/FUL, however the building erected was considered to materially differ from the consented scheme. The location and external dimensions of the building are identical to this previous application, however the following differs between the two schemes:”

“Fenestration changed to include windows at ground floor and first floor, and addition of rooflights • Introduction of first-floor within the roof space • Internal layout changes, providing a lobby, staff facilities area, bathroom, office, group meeting area, staff training area, workshop and vehicle storage, and storage areas.”

Officer report

The site

The site is a hedgerow and tree-bordered parcel south of Calfstock Lane, with an open field to the west and woodland about 250 metres away.

“1 The site comprises a parcel of land to the south of Calfstock Lane and to the north- west of Willow Cottage. The building proposed within this application has been erected on site. The site itself is bordered by hedgerows and benefits from several mature trees. To the west of the site is a large open field. The edge of Farningham Wood lies approximately 250 metres to the north-west of the site along Calfstock Lane.”

Officer report

Earlier planning history

A replacement forestry building was approved in 2020, while earlier applications concerned forestry storage and proposed countryside or agricultural workers’ housing.

“3 20/01319/FUL – Replacement of existing forestry building with new building to be used for storage associated with existing forestry yard – GRANT – 23.10.2020”

“4 03/00620/LDCEX – Use of the building as a workshop and store for tools, equipment and materials in connection with forestry, and the use of associated land for storage of materials and the parking and turning of vehicles in connection with forestry – GRANT – 21.07.2003”

Officer report

Main planning issues

The main issues were the Green Belt, the area’s character, residential amenity, parking and highways, biodiversity, and intentional unauthorised development.

“22 The main planning consideration are: • Impact on the Green Belt • Impact on the character of the area • Impact on residential amenity • Impact on parking and highways • Impact on biodiversity • Intentional unauthorised development…”

Officer report

Consultation responses

The parish council had no comment, Environmental Health raised no objection, and SGN required pipeline information and consultation before works.

“16 04/09/2026 - There is no objection to this application or adverse comments to make.”

“19 04/09/2026 - There is a high-pressure pipeline in the vicinity of your works. Your proposals would require the exact location of this pipeline and other SGN assets to be located before any work commences, either by electronic detection or by hand excavated trial holes as specified in the attached SW/2 document.”

Officer report

Objections received

One respondent sent two objection letters about unauthorised development, traffic, building use, ecology, light spill, design and other matters.

“21 2 letters of objection have been received to date, from one respondent, relating to the following issues:”

“Unauthorised development • Traffic generation and vehicle access • Lawful use of the building • Internal layout and uses of rooms • Comparison to previous application • Ecology • Light spill • Design and appearance • Current use of the building…”

Officer report

The committee’s decision

The committee agreed the recommendation and granted planning permission subject to conditions covering plans, materials, charging, bat boxes, lighting and forestry use.

“Resolved: that That planning permission be GRANTED subject to the following conditions:”

“5) Within three months of the date of this grant of planning permission, details of the installed external lighting shall be submitted to and approved by the local planning authority. The details shall include both specifications and measures of control of the lighting in addition to hours of operation. The installation of external lighting shall only be carried out in accordance with the approved details.”

Minutes

Councillors at the meeting

The minutes record this decision with no vote against, so each member present for this item is shown as voting for it.

Apologies Christine Hudson Independent

Source: Plota analysis of the council's minutes; parties from the council's list of councillors.

Sources

  • Sevenoaks Development Management Committee minutes, 12 November 2026
  • Agenda and papers (council website)

Source: Plota analysis of Sevenoaks's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Sevenoaks
Date
Thursday 12 November 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Councillors
10Conservative 5Lib Dem 3Reform UK 1Independent 1Show votes
Minutes
The council's minutes
Meeting
Agenda and papers (council website)

This committee's year

37 decisions in the 12 months to this meeting, 5 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →